My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/08/99 Construction Field Report Job No. 986011.0', <br /> DFR No. 43 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 43 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 7-08-99 Thursda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction I GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Techncianaechncian: <br /> Clear Warm FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. Allied:Forklift. GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 6 total GSE Crew: 18 total <br /> Guinn made repairs to the subgrade material on the eastern slope for GSE. Guinn moisture conditioned the <br /> subgrade material then smooth drum rolled the areas needing to be reworked. Guinn started to import and <br /> place the GDM pea Gravel. Guinn is utilizing the D4H Cat to spread the material and a laborer full time to <br /> watch for wrinkles in the geomembrane. Guinn had laborers cleaning loose material off of the <br /> geomembrane. Guinn placed part of the burrito in the LCRS V channel to the north of the sump. Guinn <br /> constructed a test pad utilizing the D5M. Guinn made several passes and turned on the geomembrane with F <br /> of pea gravel on top of it. Guinn shoveled the pea gravel off to expose the geomembrane. CQA inspected for <br /> damage.No damage was found and approval was given to utilize the D5M for spreading the GDM. Guinn <br /> graded the GDM on the west end southern portion of the cell floor to F thickness. CQA tested depth and <br /> approval was given for placement of geotextile filter and protective cover. At 3:30p.m.the ambient <br /> temperature on the geomembrane exceeded the 104 specifications and Guinn halted deployment of the <br /> GDM. <br /> GSE made repairs to the panels placed on the slope below the top deck on the eastern slope of cell WNW D- <br /> 99. GSE deployed geocomposite from the top deck down to the 2ad bench after all repairs on the <br /> geomembrane were made and tested. GSE received sewing machines today and started seaming the GDN <br /> from the top deck down to the cell floor. GSE deployed 20 panels of geocomposite with approximately <br /> 42,390fl. GSE deployed GCL and geomembrane from the 3`d bench down the slope between the Ashpit and <br /> eastern slope. GSE deployed a total of 19 panels of GCL with approximately 15732f2. GSE deployed a total <br /> of 12 panels of geomembrane with approximately 16,007W. The ambient temperature on the geomembrane <br /> was over 100 at 3p.m. (Per Specifications)GSE halted deployment. <br /> Vector Engineering,Inc. CQA observed construction of the test pad built with the D5M. CQA observed <br /> repairs made too the geomembrane below the top deck. CQA observed and logged repairs made. Observed <br /> vacuum testing of repairs made. CQA pulled 1 destruct with all tests passing the required specifications. <br /> No material delivered today. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.