07/10/99 Construction Field Report Job No. 986011.0: <br /> DFR No.46 VECTOR ENGINEERING, INC. Page No. 1 <br /> ft <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Iq <br /> Forward Landfill Allied Waste 45 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stef ' Jr. 7-10-99 Saturday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. Allied:Forklift. GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew:Not on site GSE Crew. 18 total <br /> GSE deployed GCL and HDT geomembrane on the southern slope of the Ashpit. GSE deployed a total of 20 <br /> panels of GCL with approximately 21,992W. GSE deployed a total of 11 panels of geomembrane with <br /> approximately 24,376ft. GSE deployed geocomposite on the eastern slope below the 2d bench on the <br /> southern end. GSE deployed a total of 11 panels totaling approximately 18,805.5 W. <br /> Vector Engineering, Inc. CQA observed GCL and geomembrane deployment,repairs,seaming,overlap and <br /> air testing made to the geomembrane. Observed vacuum testing of repairs made. CQA pulled 3 destructive <br /> samples with all tests meeting the required specifications. CQA marked repairs on the geocomposite. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �j <br />