07/12/99 Construction Field Report Job No. 986011.0: <br /> DFR No.46 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence]No.:Forward Landfill Allied Waste 46 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of W <br /> Manteca,CA Butch Stefan,Jr. 7-12-99 Monda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Hot FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Trul CS 5630 Cat Smooth Drum Roller. GSE: 544E John Deere Loader Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 4 total GSE Crew: 17 total <br /> Guinn continued the import and placement of the GDM pea Gravel from Granite. Guinn is utilizing the D411 <br /> and the D5M Cat Dozers to spread the material onto the geomembrane 1' minimum thickness. Guinn has a <br /> laborer watching for wrinkles in the geomembrane. Guinn's import material was found to have a major <br /> amount of fines. CQA pulled a sample for sieve analysis testing. Guinn was informed that the material <br /> looked questionable as far as meeting the requirements for the project and if the material was placed that it <br /> was at Guinns own risk until the sieve was completed for verification. Guinn will stockpile the material to <br /> the north of cell floor until the sieve was to be completed. <br /> GSE deployed GCL and geomembrane on the top of the Asit. GSE deployed a total of 36 panels of GCL <br /> with approximately 15,788.5fe. GSE deployed a total of 5 panels of HDT geomembrane with approximately <br /> 17,2591. GSE had 3 technicians wedge welding the geocomposite on the eastern slope. GSE shut down <br /> operations when the temperature rose above the specified limits for panel deployment. GSE deployed <br /> geocomposite until the heat was unbearable. GSE placed 6 panels of composite with approximately 6,183ft2 <br /> on the eastern slope. <br /> Vector Engineering, Inc. CQA observed placement and grading of GDM. CQA observed GCL and <br /> geomembrane deployment,repairs, seaming,overlap and air testing made to the geomembrane. Observed <br /> vacuum testing of repairs made. CQA pulled 1 destructive sample with passing results. CQA marked repairs <br /> on the geocomposite. <br /> [File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: U <br />