07/13/99 Construction Field Report Job No. 986011.0', <br /> DFR No. 47 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 47 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 7-13-99 Tuesday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Hot FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,CS <br /> 563C Cat Smooth Drum Roller. GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 4 total GSE Crew: 16 total <br /> Guinn continued to grade the imported GDM pea Gravel on the cell floor. Guinn is utilizing the D4H to <br /> grade the GDM. Guinn has a laborer watching for wrinkles in the geomembrane as the D4 spreads the GDM <br /> material. The D5M Cat Dozer is spreading operations material onto the approved GDM and geotextile on the <br /> north side of the sump at the western edge of the cell floor. Guinn is utilizing a 623 paddle wheel to haul the <br /> operations material down to the cell floor. Guinn utilized the material from the stockpile to the northwest of <br /> the cell for the operations layer material. The operations material is being placed F minimum thickness as it <br /> is being spread onto the geotextile. <br /> GSE deployed GCL and geomembrane on the top of the Ashpit. GSE deployed a total of 6 panel of GCL <br /> with approximately 7,695fe. GSE deployed 1 panel of geomembrane with approximately 4,312fe. GSE <br /> deployed double sided geocomposite on the top and on the south slope of the Ashpit. GSE deployed a total <br /> of 22 panels with approximately 41,809.5f12. GSE deployed single sided composite on the eastern slope. A <br /> total of 10 panels with approximately 5,737ft2 were deployed. GSE had 3 technicians wedge welding the <br /> geocomposite on the eastern slope. GSE shut down operations when the temperature rose above the <br /> specified limits for panel deployment. <br /> Vector Engineering, Inc. CQA observed placement of GDM, geotextile and the operations layer material. <br /> CQA observed GCL and geomembrane deployment, repairs, seaming,overlap and air testing made to the <br /> geomembrane. Observed vacuum testing of repairs made. CQA pulled 1 destructive sample with passing <br /> results. CQA marked repairs on the geocomposite. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: V <br />