Laserfiche WebLink
Care shall be taken when backfilling the trenches to prevent any damage to the <br />geosynthetics. The Geotechnical CQA Monitors shall observe the backfilling <br />operation and advise the Construction Manager of any problems. <br />6.2.4.2 VFPE Placement <br />Field Panel Identification <br />A field panel (sheet) is a discrete and integral area of geomembrane which is to be <br />seamed in the field along the edges to other field panels (i.e., a field panel is a roll <br />or a single portion of a single roll). The Contractor or Liner Subcontractor shall <br />assign each panel over 25 square feet an identification code, which shall be agreed <br />to and used by the Geotechnical CQA Monitors, Construction Manager, <br />Contractor and the Liner Subcontractor. The Contractor or Liner Subcontractor <br />shall locate the code with identifying roll number near the middle of panels less <br />than 50 feet in length and at both ends of any panel over 50 feet in length. The <br />Geotechnical CQA Monitors'shall establish a chart showing correspondence <br />between roll numbers, certification reports, and the panel identification code. The <br />field panel identification code shall be`used for all Geotechnical CQA records. A <br />geomembrane panel placement log will be maintained by the Geotechnical CQA <br />Monitors. <br />AML Field Panel Placement <br />."The Geotothnical CQA MonitcPrs shall,record the identification code. location,and <br />date of installation of each field panel. <br />During panel placement, the Geotechnical CQA Monitors shall: <br />Verify that field panels are installed in general accordance with the panel <br />layout.{�lan,.as approved or modified by the Construction Manager/Landfill <br />Engineer. <br />• Observe the panel surface as it is deployed and record all panel defects --.and <br />disposition of the defects. All repairs are to be made in accordance with the <br />Specifications. <br />• Observe that the equipment used does not damage the VFPE by handling, <br />trafficking, leakage of hydrocarbons, or by other means. <br />• Observe that the surface beneath the VFPE has not deteriorated since previous <br />acceptance. <br />• Observe that there are no stones, construction debris, or other items beneath <br />the VFPE, which could cause damage. <br />• Observe that the VFPE is not dragged across an unprepared surface. If the <br />VFPE is dragged across an unprepared surface, it shall be inspected for <br />scratches and repaired or rejected, if necessary. <br />• Observe that the method used to unroll the panels does not cause scratches or <br />crimps in the VFPE and does not damage the supporting soil surface. <br />-21- <br />CA2001-048TINAL COVER_CQA.DOC\08/20/01 <br />Geologic Associates <br />