• Record weather conditions including temperature, wind, and humidity. The <br />VFPE shall not be deployed in the presence of excess moisture (fog, dew, <br />mist, etc.), high winds and extreme temperatures as determined by the <br />Geotechnical CQA Officer. <br />• Observe that people working during the installation of VFPE do not smoke, <br />wear shoes, or engage in activities that could damage the VFPE. <br />• Observe that the method used to deploy the panel minimizes wrinkles and that <br />the panels are anchored to prevent movement by the wind. <br />• Observe that direct contact with the VFPE is minimized; (i.e., the VFPE is <br />protected by geotextiles, extra VFPE, or other suitable materials, in areas <br />where excessive traffic may be expected). <br />The Geotechnical CQA Monitors shall inform the Contractor, the Liner <br />Subcontractor and the Construction Manager if the above conditions are not met. <br />After placement and prior to seaming, the Geotechnical CQA Monitors shall <br />inspect'°each panel for damage. The Geotechnical CQA Monitors shall°advise°the <br />Construction Manager which panels, or portions of panels, should be rejected, <br />repaired, or accepted. Damaged panels or portions of damaged panels that have <br />been rejected shall be marked and their removal from the work area recorded by <br />the Geotechnical CQA Monitors. <br />6.2.4.3 Field Seaming <br />The Contractor shall provide'the Construction Manager and Geotechnical CQA <br />Officer with a seam and panel layout plan and shall update this plan daily as the <br />job proceeds. No panels --shall be seamed until the panel layout plan°has-been <br />approved by the Construction Manager. A seam numbering system shall be <br />agreed to icy the Geotechnical-CQA-Monitors, Construction Manager, Contractor <br />and Liner Subcontractor prior to the start of seaming operations. <br />Prior to seaming, each seaming apparatus (welder) shall be tested in accordance <br />with the Specifications to determine if the equipment is functioningnproperly. The <br />Geotechnical CQA Monitors shall observe all trial weld operations and record the <br />results. It is important that the trial welds be completed under conditions similar <br />to those under which the panels will be seamed. If at any time the Geotechnical <br />CQA Monitor believes that an operator or seaming apparatus is not functioning <br />properly, a test shall be performed on a trial weld. If there are large changes in <br />temperature, humidity, or wind speed, the trial weld test shall be repeated. <br />Laboratory tests may be carried out at the discretion of the Geotechnical CQA <br />Monitors to verify field test results. <br />During seaming operations the Geotechnical CQA Monitors shall observe that: <br />• The Liner Subcontractor has the number of welders and spare parts agreed to <br />in the pre -construction meeting. <br />-22- <br />CA2001-048TINAL COVER CQA.DOC\08/20/01 <br />Geologic Associates <br />