• Equipment used for seaming will not damage the VFPE. <br />The extruder is purged prior to beginning a seam until all the heat -degraded <br />extrudate is removed (extrusion welding only). <br />• Seam grinding has been completed less than 1 hour before seam welding <br />(extrusion welding only). <br />• The ambient temperature measured 6 inches above the VFPE surface is <br />between 40 and 105 degrees Fahrenheit and relative humidity is less than 80 <br />percent. <br />The end of welds more than 5 minutes old, are ground to expose new material <br />before restarting a weld (extrusion welding only). <br />• The weld is free of dust and other debris. <br />• For cross seams, the seam is ground to a smooth incline prior to welding. <br />The seams are overlapped in a downgradient direction with a minimum <br />overlap of 4 inches. <br />• No solvents or adhesives are present in the seam area. <br />• The procedure used to temporarily hold the panels together does not damage <br />the panels and does not preclude Geotechnical CQA testing. <br />The panels are being seamed in accordance with the Project Plans and <br />Specifications using approved equipment with gauges giving applicable <br />temperatures. <br />• There is no free moisture in the weld area. <br />. The electric generator is placed on a smooth base such that no damage occurs <br />to the VFPE. <br />• A smooth insulating plate or fabric is placed beneath the hot welding <br />apparatus after use. <br />• The geomembrane is protected from damage in heavily trafficked areas. <br />The Geotechnical CQA Monitors shall log all appropriate temperatures and <br />conditions, and shall log and report to the Geotechnical CQA Officer any -non- <br />compliance. <br />Trial Seams <br />Trial seam samples are not removed from installed seams, but are made along side <br />the seaming work area by the Liner Subcontractor using a fragment of the erne <br />VFPE sheet and the same installation procedures as for the VFPE installation <br />itself. As such, they are considered nondestructive samples. Such trial seams <br />shall be made at the beginning of each seaming period (start of day, mid-day, and <br />anytime the equipment is shut down or the seaming operation is suspended for <br />more than 1/2 hour) for each piece of seaming equipment used that day. In <br />addition, each welder shall make at least one trial seam each day. Trial seams <br />shall be made under the same conditions as those anticipated for actual seams. <br />The trial seam sample shall be at least 3 ft. long by 1 ft. plus the seam width wide <br />(after seaming) with the seam centered lengthwise. Seam overlap shall be as per <br />40 the Specifications. <br />-23- <br />C:\2001-048\FINAL COVER_CQA.DOC\08/20/01 <br />Geologic Associates <br />