Laserfiche WebLink
Two opposite specimens, each 1 -inch wide, shall be cut from the trial seam <br />sample by the Contractor and/or Liner Subcontractor. Under the observation of a <br />Geotechnical CQA Monitor, the specimens shall be tested by the Liner <br />Subcontractor in shear and peel using a field tensiometer to verify that seams <br />satisfy peel and tensile strength requirements. If a specimen fails, the seaming <br />equipment and seamer shall not be accepted and shall not be used for seaming <br />until the deficiencies are corrected and two consecutive successful full trial welds <br />are achieved. After completing a successful trial/nondestructive sample, the <br />Contractor and/or Liner Subcontractor shall cut a 2'x 2' remnant from the sample <br />and mark the welder number, date, time, ambient temperature, welder <br />temperature, and speed and submit it to the Geotechnical CQA Monitor -who -will <br />assign an identification number and enter the information on the non-destructive <br />sample form. <br />The results of field tests carried out on trial seams shall be documented by the <br />Geotechnical CQA Monitors. <br />General Seaming Procedure <br />Unless otherwise specified, the general seaming procedure to be used by the <br />Contractor and/or Liner Subcontractor shall be as follows: <br />All VFPE seams shall be overlapped a minimum of four (4) inches. <br />"Fishmouths" or wrinkles at the seam overlaps shall be cut along the ridge of <br />'the wrinkle in older to achieve a flat overlap. The cut "fishmouths" or <br />wrinkles shall be seamed and any portion where the overlap is inadequate <br />°shah then be -patched with -an oval orround-patchof the same VFPE trxtentting <br />a minimum of 6 inches beyond the cut in all directions. All corners of the <br />pat�ch-•shai-1,be r-ounded with -a 1 -inch mini rn-radius. <br />• Adjacent to anchor trenches, seaming shall extend up the panels a minimum <br />of 12-inches.,pastAhe crest -of the anchor.trench. <br />• All cross seams shall be offset at least two feet from the cross seam of the <br />adjacent panel and be extrusion or wedge welded where they intersect. <br />The Geotechnical CQA Monitors shall observe that the above seaming procedures <br />are followed, and shall inform the Construction Manager if they are not. <br />6.2.5 CONSTRUCTION TESTING <br />6.2.5.1 Nondestructive Seam Testing <br />The Contractor and/or Liner Subcontractor shall non-destructively test all field <br />seams over their full length using a vacuum test unit, spark detector, or an air <br />pressure test (for double wedge fusion seams only), as described below. The <br />purpose of nondestructive tests is to check the continuity of seams. It does not <br />-24- <br />CA2001-048\FINAL COVER_CQA.DOC\08/20/01 <br />Geologic Associates <br />