Laserfiche WebLink
provide any information on seam strength. Continuity testing shall be carried out <br />as the seaming work progresses, not at the completion of field seaming. <br />Visual Inspection <br />All seams shall be visually evaluated by the Contractor and/or Liner <br />Subcontractor as the installation progresses and again at completion of the <br />installation. Defective and questionable sections shall be clearly marked and <br />repaired as necessary. <br />Vacuum Box Testing <br />If the fillet weld, extrusion lap weld or single hot -wedge fusion lap weld <br />technique is used to weld seams, the Contractor and/or Liner Subcontractor shall <br />further test all seams and repairs in the VFPE by vacuum box. The vacuum box <br />shall be an American Vacuum Seam Tester, Series A100 as manufactured by <br />American Parts and Service Company, Alhambra, California, or -an -approved <br />equal. All vacuum box testing shall be done in the presence of the Geotechnical <br />CQA Monitor. The area to be tested shall be cleaned of all dust, "debris, dirt and <br />other foreign matter. A soap solution shall be applied to the test area with a <br />brush, paint roller or spray bottle and a minimum vacuum of 10 inches of mercury <br />(Hg) (5 psi) shall be induced and held as long as necessary to visually inspect and <br />mark for repair any suspicious areas as evidenced by bubbles in the soap solution. <br />Spark Testing <br />If the fillet weld is used to weld seams, the Contractor and/or Liner,Subcontractor <br />may, in lieu of vacuum box testing, test all seams and repairs in the VFPE liner by <br />using a high voltage spark detector, similar to Tinker and Rasor H®liday-Detector <br />(Model AP -W). The setting of the detector shall be 20,000 volts. In order to <br />conduct this test, all seams to be tested shall be provided with.24730.gauge copper <br />wires properly embedded in the seams and grounded. All spark testing shall be <br />done in the presence of the Geotechnical CQA Monitor. All-de€ectiveareas-shall <br />be marked for repair. <br />Air Pressure Test <br />If the double hot -wedge welding technique is used, the Contractor and/or Liner <br />Subcontractor shall further test all seams in the VFPE lining by using the air <br />pressure test which consists of inserting a needle with gauge in the air space <br />between welds. Air shall be pumped to 40 psi within the weld void and held for <br />at least 5 minutes. If the pressure loss exceeds 2 psi within the weld void during <br />air pressure testing, the outside weld edge (not free edge) shall be sprayed with a <br />soap solution and visually examined for bubbles. If no bubbles appear, the <br />problem is with the inside weld and the seam is acceptable. If any bubbles <br />-25- <br />C:\2001-048\FINAL COVER_CQA.DOC\08/20/01 <br />Geologic Associates <br />