Laserfiche WebLink
appear, the defect shall be, repaired by extrusion welding and tested by vacuum <br />box and spark detector. <br />If pressure loss is not more than 2 psi, the opposite end of the seam will be <br />punctured to release the air. If a blockage is present, it will be located and tests <br />on both sides of the blockage will be completed. All penetration holes created <br />during testing shall be sealed by patching and extrusion welding. <br />Responsibilities of the Geotechnical CQA Monitors <br />The Geotechnical CQA Monitor/Manager shall: <br />• Observe and record the continuity of all testing. <br />• Record the location seam/panel number, date, time, equipment number, <br />Geotechnical CQA Monitor name, test number, welding technician's name, <br />weld, sheet and ambient temperatures and results of all testing. <br />• Mark the failed areas with a waterproof marker compatible-xith'thr- ming <br />material and inform the Contractor and/or Liner Subcontractor and the <br />Construction Manager of any required repairs. <br />• Observe that all testing is completed in accordance with the Project <br />Specifications. <br />• Observe that all repairs are completed and tested in accordance with the <br />Project Specifications. <br />6.2.5.2 Destructive Seam Testing <br />Destructive seam tests shall be performed at selected locations. - Tire purpose=of <br />these tests is to evaluate seam strength. Seam strength testing shall be done as the <br />seaming work progresses, not at the completion of all field seaming. <br />Destructive sampling involves samples that have been removed.from-theinstalled <br />field seams by the Contractor/Liner Subcontractor. Test locations shall be <br />determined at the discretion of the Geotechnical CQA Monitors andthe <br />Contractor/Liner Subcontractor shall not be informed in advance of the locations <br />where the seam samples will be made or will be removed. <br />Destructive samples shall be delivered to the Geotechnical CQA Officer by the <br />Contractor/Liner Subcontractor and shipped to the Independent Testing <br />Laboratory. All costs associated with the collection, repair, shipping and testing <br />of destructive samples will be borne by the Contractor/Liner Subcontractor. <br />A minimum of one destructive sample per 500 feet of field seam shall be <br />obtained. This average frequency will be used for the entire installation with the <br />actual frequency of samples based on performance as determined by the <br />Geotechnical CQA Officer. <br />-26- <br />C\2001-048TINAL COVER CQA.DOC\08/20/01 <br />Geologic Associates <br />