Laserfiche WebLink
up to an elevation of 150 feet AMSL down to master plan base grades. As part of <br />this project, the area will be cleared and grubbed, as necessary, and the closure <br />improvements constructed (e.g., final cover, permanent drainage, landfill gas <br />system modification, etc. <br />Stage III <br />Stage III is a 5.9 -acre area as shown on Figure 3. This area includes the final fill <br />slopes adjacent to Stage II along the southern slopes of the northern portion of the <br />landfill to an elevation of 150 feet AMSL. The closure volume estimates are based <br />on waste fill up to an elevation of 150 feet AMSL down to the master plan base <br />grades. As part of this project, the area will be cleared and grubbed, as necessary, <br />and the closure improvements constructed (e.g., final cover, permanent drainage, <br />landfill gas system modification, etc.). <br />Stage IV <br />Stage IV is a 13.7 -acre area as shown on Figure 4. This area includes the final fill <br />slopes located between Stages III and I and along the northern slopes up to an <br />elevation of 150 feet AMSL. The closure volume estimates are based on waste fill <br />up to an elevation of 150 feet AMSL down to the master plan base grades. As part <br />of this project, the area will be cleared and grubbed, as necessary, and the closure <br />improvements constructed (e.g., final cover, permanent drainage, landfill gas <br />system modification, etc.). <br />Stage V <br />Stage V is an 11.8 -acre area as shown on Figure 5. This area includes final fill <br />slopes along the northeast of the northern portion of the landfill up to an elevation <br />of 90 feet AMSL. The closure volume estimates are based on the top of waste fill <br />plan down to the master plan base grades. As part of this project, the area will be <br />cleared and grubbed, as necessary, and the closure improvements constructed <br />(e.g., final cover, permanent drainage, landfill gas system modification, etc.). <br />Stage VI <br />Stage VI is a 20.7 -acre area as shown on Figure 6. This area includes the northern <br />final fill slopes adjacent to Stages I, IV, and V up to an elevation of 150 feet AMSL. <br />The closure volume estimates are based on the top of waste fill plan down to the <br />master plan base grades. As part of this project, the area will be cleared and <br />grubbed, as necessary, and the closure improvements constructed (e.g., final <br />cover, permanent drainage, landfill gas system modification, etc.). <br />Stage VII <br />Stage VII is a 166.7 -acre area as shown on Figure 7. This area includes the entire <br />Is deck area of the landfill up to an elevation of 200 feet AMSL. The closure volume <br />Ell <br />SWT Engineering <br />Forward Landfill - PCPCMP Amendment <br />(Z:\PROJECTS\Al lied Waste\Forward\JN81013 5 yr Review Plan\JTD Amd 3 PCPCMP Amd 3 Dec 08\PCPCMP Amend 3 121808.doc; <br />Amendment No. 3: 12/18/08) <br />