Laserfiche WebLink
® estimates are based on a "flat deck" at an elevation of 200 feet AMSL down to the <br />master plan base grades. As part of this project, the area will be cleared and <br />grubbed, as necessary, and the closure improvements constructed (e.g., final <br />cover, permanent drainage, landfill gas system modification, etc.). <br />Stage VIII <br />Stage VIII is a 24.1 -acre area as shown on Figure 8. This area includes the entire <br />deck and slope area of the southern most portion of the landfill. The closure <br />volume estimates are based on a "flat deck" down to the master plan base grades. <br />As part of this project, the area will be cleared and grubbed, as necessary, and the <br />closure improvements constructed (e.g., final cover, permanent drainage, landfill <br />gas system modification, etc.). <br />1.3 Maximum Extent of Landfill That Will Ever Require Closure <br />The maximum extent of the landfill that will ever require closure during the life of the <br />landfill is 187.6 acres since Stage IA partial final closure construction was completed <br />in 2006. Table 1 presents the anticipated staged closure acreages versus the liner <br />development phases to show the maximum extent that would ever require closure. As <br />shown, liner development Phases 1, 2, 3 and 4 would be completed before the Stage I <br />closure is implemented creating the basis for maximum extent. <br />The site's closure staging was developed so as to not interfere with active disposal <br />0 operations. <br />1.4 Closure Implementation <br />A closure implementation schedule for the FL will be presented in each Partial Final <br />Closure as phased closure is implemented. Closure construction will begin with <br />mobilization of equipment and materials. The type of equipment and required <br />personnel expected to be utilized during closure construction includes, but is not <br />limited to, the following: <br />• Equipment <br />— Scrapers <br />— Dozers <br />— Loaders <br />— Compactors <br />— Trucks <br />— Soil Processing Equipment <br />— Motor Grader <br />— Water Truck <br />• Personnel <br />Construction Manager <br />5 <br />SWT Engineering <br />Forward Landfill - PCPCMP Amendment <br />(Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\JTD Amd 3 PCPCMP Amd 3 Dec 08\PCPCMP Amend 3 121808.doc; <br />Amendment No. 3: 12/18/08) <br />