My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— Field Inspector(s) <br />— Site Engineer(s) <br />— Geotechnical Technician(s) <br />— Labor Crews <br />— Equipment Operators <br />— Surveyors <br />— Mechanics <br />Construction Schedule <br />The start of partial closure construction activities for the FL partial closure and <br />maintenance areas will commence once refuse fill elevations in that area are <br />achieved. Table 2 presents the anticipated closure construction period for the <br />187.6 -acre closure area. Closure construction activities will include the following <br />tasks: <br />• Equipment Mobilization <br />• Signage <br />• Site Exploration and Survey <br />• Structure Removal/Demolition (last phase only) <br />• Excavation of Final Cover Soil (foundation and vegetative layers only) <br />• Final Cover Placement (including geomembrane) <br />• Landfill Gas System Modifications <br />• Permanent Drainage Control Feature Installation <br />• Drainage Control Systems Modifications <br />• Seed and Mulch Installation <br />• Demobilization <br />Some of these activities will be conducted concurrently. <br />Construction Management <br />A construction management team will be on-site during the entire period of closure <br />construction. The team will be under the direction of a Construction Manager, who <br />will supervise construction of the various features included in the closure plan. The <br />Construction Manager will coordinate the activities of the on-site contractor(s) and <br />will provide liaison among Allied staff, the design engineers and the contractors. <br />Other key staff may include a Site Engineer and Construction Inspector(s). A survey <br />crew and a geotechnical CQA crew will be present, as required. <br />Survey Control <br />The survey control crew, under the direction of Allied, will be responsible for <br />the surveyed location of the closure plan improvements and for record <br />drawing information. They will be responsible for documenting that the <br />6 <br />SWT Engineering <br />Forward Landfill - PCPCMP Amendment <br />(Z:\PROIECTS\Al lied Waste\Forward\)N81013 5 yr Review Plan\JTD Amd 3 PCPCMP Amd 3 Dec 08\PCPCMP Amend 3 121808.doc; <br />Amendment No. 3: 12/18/08) <br />
The URL can be used to link to this page
Your browser does not support the video tag.