1.8.12 Partial Final Closure and Post -Closure Maintenance Plan Preparation <br />This category covers the cost to prepare a Partial Final Closure Plan for the Stage <br />VIII Closure area. <br />1.8.13 Continency <br />A 20 percent contingency factor has been added to the construction cost estimate. <br />1.9 Post -Closure Maintenance Cost Estimate <br />The post -closure maintenance cost estimate previously prepared is not affected by <br />the proposed changes included in this Amendment. The post -closure cost estimate <br />is presented in Amendment No. 4 of the 2002 PCPCMP and reflects 2008 costs. <br />The operator will initiate post -closure maintenance activities as the staged closure <br />of the FL is implemented. The operator's understanding is that a minimum of the <br />last thirty (30) years of post -closure maintenance must be funded. Therefore, the <br />ongoing post -closure obligation under state law will continue for a minimum of 30 <br />years after the Stage VIII closure area is completed. <br />1.10 Demonstration of Financial Assurance <br />Closure and Post -Closure Maintenance Fund <br />In accordance with 27 CCR, Chapter 6 and 40 CFR, Subpart G, an operator must <br />demonstrate financial assurance for the proper closure, post -closure maintenance <br />and corrective action for reasonably foreseeable releases at a landfill. An Insurance <br />Policy demonstrating coverage for closure and post -closure maintenance costs has <br />been evaluated and approved by the CIWMB for the FL. This closure cost estimate is <br />reflected in 2008 dollars and prepared in accordance with 27 CCR regulations. Upon <br />approval of this Amendment (Amendment No. 3), the Closure Cost Estimate <br />presented in Table 3 will serve as the basis for closure funding utilizing an approval <br />financial assurance mechanism. <br />1.11 California Environmental Quality Act Documentation <br />As discussed above, stand alone Partial Final Closure Plans will be prepared in <br />advance of each closure stage. The operator will comply with CEQA and evaluate <br />potential impacts associated with each staged closure project. Appropriate CEQA <br />documentation will be prepared in support of obtaining agency approval of the Partial <br />Final Closure Plans. <br />0 10 SWT Engineering <br />Forward Landfill - PCPCMP Amendment <br />(Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\JTD Amd 3 PCPCMP Amd 3 Dec 08\PCPCMP Amend 3 121808.doc; <br />Amendment No. 3: 12/18/08) <br />