Laserfiche WebLink
Reuse Soils may be used anywhere and do not require containment within a lined <br /> landfill cell. The soil materials are recognized as beneficial reuse under 27 CCR, <br /> Section 20686. <br /> It should be noted that in no event will any combination of the beneficial use <br /> materials which include green waste, treated auto shredder waste, beneficial reuse <br /> inerts, shredded tires, limited reuse soils, Class II disposal and refuse exceed the <br /> maximum daily limit of 8,668 TPD. To establish the limits for the materials shown <br /> above, Forward reviewed the weight and volume records for the site from 2003 to <br /> the end of 2006. In addition, in conjunction with the LEA, Forward also conducted a <br /> field test of the treated auto shredder waste (TASW) and the processed green waste <br /> (PGM) to determine their in-place density (See Appendix C-1). A tracking form was <br /> also developed to track the use of all ADC materials used on-site each day. This <br /> form is also included in Appendix C-2. The purpose of the tracking form is to allow <br /> the LEA to compare the amount of ADC material utilized on a daily basis and <br /> compare that against the weight and volume records for these materials to <br /> determine if any of these materials are over used. <br /> As part of the evaluation to establish the "Need" for each ADC material, the <br /> following table was developed with a range of average active working face areas, <br /> depth of cover material and area covered by synthetic tarps and associated cover <br /> volume. <br /> FORWARD LANDFILL <br /> COVER NEED BASED ON WORKING FACE AREA/ <br /> DEPTH OF COVER AND SYNTHETIC TARP COVERAGE <br /> Working Face Size Total Area lCover Need in Cubic Yards Cover Need with 50%Synthetic Tarp Coverage <br /> (Length x Width) In Square Feet 1 12"inches 18"inches 12"inches 18"inches <br /> 100 200 20,000 741 1,111 370 556 <br /> Working Face Size Total Area lCover Need in Cubic Yards Cover Need with 35%"Synthetic Tarp Coverage <br /> (Length x Width) In Square Feet 1 12"inches 118"inches 12"inches 18"inches <br /> 150 200 30,0001 1,1111 1,667 722 1,083 <br /> Working Face Size Total Area I Cover Need in Cubic Yards Cover Need with 20%"Synthetic Tarp Coverage <br /> (Length x Width) In Square Feet12"inches 118"inches 12"inches 1 18"inches <br /> 200 1 250 50,000 1,852 2,778 1,481 2,222 <br /> Note:Cover need is based on a synthetic tarp area of 10,000 sq ft,expressed as percentage of the total working face.The depth of cover <br /> shown above represent the maximum allowed under 27 CCR for shredded green waste and treated auto shredder waste,respectively. <br /> The field tests conducted at the landfill in October 2006 established in-place <br /> densities for the shredded green waste and treated auto shredder waste, two of the <br /> Forward Landfill JTD 4-9 <br /> J:\Allied\Forward\JTD Amendment\January 2007 JTD Amendment\JTD Sec 4 Final.doc: <br /> 05/24/02;Amendment No. 1: 2/1/2007 ®RYAN A.STIRRAT&ASSOCIATES <br />