My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002_3 JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002_3 JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:53:01 PM
Creation date
7/3/2020 10:49:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002_3 JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.4.4.2 CONSTRUCTION <br /> The construction inspection activities of the CQA team will generally include: <br /> • Review of contractor's submittals, samples, and supporting test reports. <br /> • Review of the contractor's work schedules. <br /> • Verification that liner materials are as specified in the plans and specifications <br /> or as approved by the engineer. <br /> • Observation of all phases of the liner construction and documentation of the <br /> contractor's compliance or noncompliance with the approved plans and <br /> specifications, and/or the directions of the engineer. Field tests and visual <br /> observations will be used to evaluate construction practices. <br /> • Accommodate seasonal conditions, if warranted. <br /> Testing Program <br /> A field testing program will be implemented during construction to evaluate <br /> whether all components are constructed according to the design specifications. <br /> All field tests will be conducted by CQA personnel or qualified laboratories <br /> under the supervision of the CQA personnel. <br /> Daily Recordkeeping and Reporting <br /> A summary report will be prepared daily by each technician with supporting <br /> inspection data sheets and records of any problems that occur or corrective <br /> measures that are implemented throughout the construction period. Daily <br /> reports will include the following: <br /> • Date, name of project, and location. <br /> • Weather and site conditions. <br /> • Summary of any meetings conducted and the results of the meetings other <br /> than formal periodic meetings. <br /> • Location of daily construction activities and progress. <br /> • Record of equipment and personnel working areas. <br /> • Location of work being tested and areas passing final inspection. <br /> • Description and condition of any materials received at the site. <br /> 1onvard landfill)TD 5-29 <br /> l:\Allied\2000.193\Reports\STD-PC PC MP702:Sec-5.0:5/24/02 <br /> Revision 1:07/16/02 <br /> BRYAN A.STIRRAT 6 ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.