My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VC"ITOR <br /> NGINEERING, INC. <br /> 0 DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 50 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. November,3,2003 Monday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Tim Sues Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Cold, clear and Ken Davila <br /> CLAY breezy <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the new Sukut foreman to discuss the possibility of performing earthwork <br /> today after yesterday's rain. He stated that no work would be done. GSE arrived on site and began <br /> performing repairs, patches and air testing on the material deployed on Saturday. Their forklift was parked <br /> on the cell floor over the weekend and could not be moved, without damaging the clay placed, until the clay <br /> dried. After a slight drying of the clay, air and vacuum box testing,repairs and destructive sample cutting, <br /> they began to place geocomposite. The material was placed over the 60 mil placed on Saturday. Sandbags <br /> were placed on and under the west toe of slope liner of the cell to protect the GCL beneath. <br /> Two(2)destructive samples were marked for testing at random locations. GSE cut the samples; their <br /> portions were tested and were within specification. At the end of the day, the two remaining portions of the <br /> destructs were given to Vector and Forward. One will be tested tomorrow and the other archived by <br /> Forward personnel. The superintendent for GSE stated that they would probably not deploy tomorrow but <br /> would check on the clay along the west toe of slope in the morning and on the status of the lechate pond <br /> with Butch S. <br /> Quartaroli Surveying was on site in the late afternoon to shoot the lechate pond floor. <br /> One(1)truck arrived on site with the eight-ounce(8oz) geotextile for the access road. <br /> AOL <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r_9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.