My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VIrw"Idr"ITOR <br /> Eu <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORTI* <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 39 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. October 22,2003 Wednesda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> David Hasal Are Khounmouang Lochlin Caffey <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Hot,clear and Ken Davila <br /> breezy <br /> Equipment on site: <br /> 1-D6 dozer, 1-water truck, 1-D5 dozer 2-633 scra ers, 1- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site today for testing and observations at the location listed above. King B. (Sukut <br /> superintendent)was on site in the morning to discuss the week's plan of operation. Sukut Construction <br /> continued the earthworks operations with the blade cutting subgrade in the outer FU-03 cell floor areas. The <br /> scrapers hauled the excess cut material from the cell floor and from the leachate pond to the stockpile. The <br /> D5 dozer cut the floor of the desilting pond and the D6 dozer continued cutting the north and east slopes ofle <br /> the leachate pond. Sukut's surveyors were on site today to plot points throughout the work area. <br /> Review of the certifications and the on site check-in of geocomposite was completed. The geotextile <br /> material(12oz)review had begun in the mid-morning and will continue tomorrow. Two(2)samples of 60 <br /> mil HDPE were delivered to off site Vector personnel for delivery to the Vector laboratory. One sample <br /> was single side textured and the other was double side textured. On site lab testing of the clay material <br /> continued with the completion of two(2)minus 200 washes in the morning and one(1)in the afternoon. <br /> An informal meeting was held on the FU-03 cell floor in the morning to discuss project progress,the <br /> sump construction and clay placement. In the afternoon,the formal weekly meeting was held to discuss <br /> project scheduling, clay testing, liner installation and various other components of the cell liner system. <br /> Project engineer, Sangeeta Lewis was on site for both meetings. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-? <br />
The URL can be used to link to this page
Your browser does not support the video tag.