My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17ECTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 40 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. October 23, 2003 1 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> David Hasal A e Khounmouan9 Bryan Fritzler Vector <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Warm, clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-D6 dozer, 1-water truck, 1-D5 dozer, 1-633 scra er 1-16G blade 1-backhoe, 1-trencher <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site today and began testing the clay materials previously sampled. In the early to mid <br /> morning, one(1)truck arrived with two(2)rolls of sixteen(16oz)ounce geotextile,ten(10) rolls of eight <br /> (8oz)ounce geotextile and fifteen(15)rolls of geonet. The material was unloaded by Forward personnel, <br /> checked for damage and logged in. <br /> Sukut continued the earthworks operations with the blade cutting subgrade in the west FU-03 cell floor in <br /> the early morning. The scraper hauled the excess cut material from the cell floor to the stockpile. The D6 <br /> dozer finished cutting the slopes of the leachate pond in the late morning. The trencher and backhoe began <br /> cutting the west anchor trench of the cell. Sukut's surveyors and Mike Q. (Quartaroli Surveying) were on <br /> site today to check the cell floor subgrade and slopes. In the mid-afternoon,the north and east sides of the <br /> cell floor were scrafied and clay placement began on the north end. <br /> Review of the certifications and the on site check-in of geotextile material (12oz)had begun in the mid- <br /> morning and will continue tomorrow. On site lab testing of the clay material continued with the completion <br /> of three(3) sieve analyses. All three passed the required specification. <br /> Bryan F. (Vector-project manager)was briefly on site to review data sheets,deliver conformance test <br /> results and to discuss project progress and scheduling. <br /> The drillers were on site to continue well abandonment on the access road. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> C-,) <br />
The URL can be used to link to this page
Your browser does not support the video tag.