TZEC"TOR <br /> ENGINEERING,INC. <br /> DAISY CONSTRUCTION s ucrIoN FrELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 48 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward, Inc. October 31, 2003 1 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Cold,raining and Ken Davila <br /> CLAY wind <br /> Equipment on site: <br /> 1-D6 dozer, I-water truck, 1-633 sora er, I- 16G blade, 1-backhoe I-smooth drum roller, 1-140H blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with Ayre K. (GSE superintendent)in the early morning to discuss the possible <br /> geosynthetic clay liner(GCL)deployment schedule. He began placing sandbags along the west slope of the <br /> cell but it began to rain. He stated that the crew would probably be sent off site until Monday,but he will be <br /> on site tomorrow to check subgrade and weather and call me in the morning if they were going to deploy. <br /> A representative of the Water Board was on site to perform visual recon on the five to one(5:1)slope in <br /> order to make a determination on weather or not the GCL could be placed with an overlap or horizontal <br /> seam. <br /> Earthworks operations continued with one(1)scraper hauling minor amounts of excess clay from the <br /> windrows generated by the blade that continued to finish cut the clay on the cell floor. The D6 dozer graded <br /> and widened the access road into the cell that will be used for general truck access. The backhoe and <br /> smooth drum roller cleaned and prepared the west toe of slope in the FU-03 cell in preparation for <br /> tomorrow's liner deployment. The 140H blade began finish cutting the leachate pond floor but blew a <br /> hydraulic hose in the late morning and was down for the afternoon. <br /> Review of the roll certifications of the sixteen-ounce(16oz), eight-ounce(8oz) geotextile and the geonet <br /> continued as time permitted. The twelve-ounce(12oz)geotextile was completed by shift's end. <br /> repared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r,-? <br />