Laserfiche WebLink
17ECTOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPOR <br /> $1 <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 49 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward, Inc. November 1,2003 Saturday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasa] I Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Cold,clear and Ken Davila <br /> CLAY brae to wind <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> After receiving an early morning phone call from the GSE superintendent,I arrived on site and met with <br /> him to discuss the deployment schedule for the day. They began placing geosynthetic clay liner(GCL)on <br /> the west slope of the FU-03 cell working from north to south. Fifteen panels of 60 mil single textured <br /> HDPE were also placed, seamed and air tested on the same slope. Geocomposite was placed over that. <br /> Sandbags were also placed along the west toe of slope of the cell. <br /> Sukut was not on site and therefore no earthworks operations were performed. <br /> Prepared By: f Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r_, <br />