My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_15
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:51:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_15
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_15.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VECTOR <br />ENGINEERING, INC. <br />Ah <br />DAILY CONSTRUCTION <br />FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward Landfill Closure <br />021605.06 <br />19 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />September 13, 2005 <br />1 Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material <br />Weather: <br />CQA Technician: <br />On site native light brown silty Cl a <br />Warm, clear and breezy <br />Ken Davila <br />Equipment on site: <br />1-Sheepsfoot roller, 3 -water trucks, 1-D6 dozer, 8-627 scrapers, 1-140 blade, 1- John Deere with discs, 1-966 loader <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the job location listed above. Guinn <br />Construction began the morning using four of the 627 scrapers to haul clay and four to haul topsoil <br />throughout the day. One dozer, one water truck and the Sheepsfoot roller also worked on the north slope. <br />The other water trucks moisture conditioned the haul roads and the cut area behind the tractor with discs. <br />® The contractor began excavating the I% slope for the seep collection pipes along the toe of the north slope. <br />Sections of perforated and nonperforated pipes were placed along the shallow trench as were the leachate <br />collection sumps. The surveyor was on site to shoot the north slope, trench lines and the collection sump <br />locations. <br />Thirty-five (35) nuclear moisture density tests were performed at random locations and elevations on the <br />north slope fill area, west to east. All tests passed the specified values in density and moisture content and <br />the on site foreman was verbally informed of the test results. <br />repared By: Reviewed By:G <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.