17E�TOR <br />ENGINEERING INC <br />0 DAILY CONSTRUCTION► REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward Landfill Closure <br />021605.06 <br />34 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />October 4, 2005 <br />Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />GSE <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Ricky Sisombath <br />Carlos Padilla <br />Source and Description of Fill Material <br />Weather: <br />CQA Technician: <br />On site native brown silty Clay <br />Cool to warm, clear and windy <br />Ken Davila <br />Equipment on site: <br />1-Sh=sfoot roller, 3 -water trucks, 2-D6 dozers, 6-627 scrapers, 1-140 blade, 1-966 loader <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the job location listed above. Guinn <br />Construction continued using the scrapers to haul clay from the northern and central cut areas throughout <br />the day. Six (6) scrapers continued placing fill material from west to east. One dozer, with GPS, one of the <br />water trucks and the sheepsfoot roller also worked on the north slope fill area. The other water truck <br />moisture conditioned the haul roads and the cut area behind the other dozer. <br />Twenty-three (23) nuclear moisture density tests were performed at random locations and elevations on <br />the north slope fill area. All tests passed the specified values in density and moisture content and the on site <br />foreman was verbally informed of the test results. Two permeability samples (P-15 & P-16) were obtained <br />from the fill area and will be transported to the Vector laboratory for off site testing. One sample of geogrid <br />was also obtained for off site testing. <br />The GSE crew arrived on site and began filling sand bags in the morning. <br />Lo <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Reviewed By: ItL <br />