Laserfiche WebLink
Northern Portion of WMU FU-06 August 2006 <br /> Forward Landfill Project No.021605.07 <br /> Vector's CQA Monitor verified that the installer marked the panels deployed and <br /> that each panel placed was marked with the manufacturer's roll number. <br /> • Field Panel Placement <br /> During the panel placement, Vector's CQA Monitor kept panel deployment logs. <br /> These logs recorded the location (panel number and roll number), installation <br /> schedule (date and time), weather conditions (temperature and wind), and thickness <br /> of the sheet. These panel deployment logs are presented within Appendix C. <br /> 4.2.3.2 Field Seaming <br /> • Seam Layout <br /> Vector's CQA Monitor documented that the seam numbering system is compatible <br /> with the panel numbering system. A seam numbering system was assigned by <br /> using both panel numbers separated with a dash (i.e.: as in 3/4 is the seam of panel <br /> 3 and panel 4) <br /> • Seaming Equipment and Products <br /> Vector's CQA Monitor observed that the seaming equipment used by the <br /> subcontractor was in accordance with the project specifications. In addition, Vector <br /> verified that the extrudate (welding rod) used was compatible with the <br /> geomembrane material and was comprised of the same resin as the geomembrane. <br /> The liner crews seamed the HDPE geomembrane panels using double wedge and <br /> extrusion welding techniques. The majority of seams were joined using double <br /> wedge welders, with difficult geometry and repairs made using extrusion welders. <br /> Vector's CQA Monitor observed the seaming activities and observed for proper panel <br /> overlap, cleanliness of the seams, grinding where required, and speed and <br /> temperatures of the equipment used. Documentation of the activities was recorded <br /> Vector Engineering,Inc.•143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -8- <br />