My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:52:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northern Portion of WMU FU-06 August 2006 <br /> Forward Landfill Project No.021605.07 <br /> on the geomembrane seaming log, which includes information on the seam number, <br /> date, time, welding machine, technician, machine temperature, and wind condition. <br /> The geomembrane seaming logs are included in Appendix C. <br /> • Seam Preparation <br /> Vector's CQA Monitor observed that the preparation of the seams was in <br /> conformance with the project specifications and the seam area was clean and free of <br /> moisture, debris and foreign materials prior to seaming. <br /> • Weather Conditions for Seaming <br /> Vector's CQA Monitor verified and documented that the weather conditions for <br /> seaming were within the project specifications and manufacturer's guidelines. <br /> • Trial Seams <br /> Prior to seaming activities at the beginning of each day, and at a minimum once <br /> during the middle of the shift, a trial seam (start-up trial weld) was prepared for <br /> each of the wedge and extrusion welders used for that shift. The seaming <br /> technicians prepared a test specimen and marked the sample with the machine <br /> number, machine temperature, date, time, and operator name. <br /> The shear and peel tests were performed in the field in accordance with ASTM D- <br /> 6392. If the start-up weld sample failed to meet the project specifications, the <br /> welding technician and supervisor were notified and advised to take corrective <br /> action or put that machine out of service. The CQA monitor documented the trial <br /> welds, which included the date, time, temperature, machine number, technician, <br /> and results of the shear and peel testing. The geomembrane start-up trial weld logs <br /> are presented within Appendix C. <br /> Vector Engineering,Inc.•143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.