Laserfiche WebLink
• <br />TABLE 8 <br />FORWARD LANDFILL <br />CLOSURE COST ESTIMATE <br />SUMMARY <br />Item <br />No. <br />Description <br />Estimated Unit <br />Quantity Price <br />Tota! <br />�$) <br />10 <br />JENGINEERING DESIGN 4) <br />1 LS $965,560 <br />$965,560 <br />Subtotal <br />$965,560 <br />11 <br />1CONSTRUCTION MANAGEMENT 1 LS 1 $781,200 <br />$781,200 <br />Subtotal <br />$781,200 <br />12 <br />FINAL CLOSURE AND POST -CLOSURE MAINTENANCE PLAN (FCPCMP) PREPARATION <br />Report Preparation LS 1 $45,000 <br />$45,000 <br />Subtotal <br />$45,000 <br />Total Construction Cost <br />Contingency 20% <br />FCPCMP Preparation <br />Total Closure Cost <br />$20,276,768 <br />$4,055,354 <br />$45,000 <br />$24,377,121 <br />Assumptions: <br />(1) Cover costs assume at least one foot of foundation material in place on the deck and slopes at closure. <br />(2) Assumes 10 percent of VFPE area (10 -foot on center spacing). <br />(3) System to be in place prior to closure construction. <br />(4) Cost is approximately five percent of total construction cost. <br />Forward Landfill PCPCMP <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:cpcostest.:5/21/02 Page 2 of 2 <br />BRYAN A. STIRRAT & ASSOCIATES <br />