Laserfiche WebLink
v <br />TABLE• <br />FORWARD LANDFILL <br />ANNUAL POST -CLOSURE MAINTENANCE AND MONITORING <br />COST ESTIMATE SUMMARY <br />Item <br />No. <br />Description <br />Quantity <br />Unit Price <br />($) 1 <br />Total <br />($) <br />1 <br />LANDFILL GAS CONTROL (1) <br />System Maintenance/Repair <br />Inspection <br />64 hrs <br />45.21per/hr <br />$2,893 <br />Labor <br />200 hrs <br />45.21per/hr <br />$9,042 <br />Equipment <br />1 LS <br />10,250 <br />$10,250 <br />Materials <br />1 LS <br />44,800 <br />$44,800 <br />S stem Monitoring/Testing <br />Flare - Source Testing <br />1 LS <br />22,000 <br />$22,000 <br />Labor <br />160 hrs <br />45.21per/hr <br />$7,234 <br />Equipment <br />1 LS <br />7,000 <br />$7,000 <br />Materials/Laborato <br />1 LS <br />20,000 <br />$20,000 <br />Management <br />60 hrs <br />125per/hr <br />$7,500 <br />Reporting <br />1 LS <br />15,000 <br />$15,000 <br />Subtotal <br />$145,719 <br />2 <br />GROUNDWATER MONITORING SYSTEM 2 <br />System Maintenance/Repair <br />Inspection <br />32 hrs <br />45.21 <br />perthr <br />$1,447 <br />Labor <br />60 hrs <br />45.21per/hr <br />$2,713 <br />Equipment <br />1 LS <br />2,500 <br />$2,500 <br />Materials <br />1 LS <br />5,100 <br />$5,100 <br />System Monitoring <br />Labor <br />160 hrs <br />45.21 <br />2er/hr <br />$7,234 <br />E ui ment <br />1 LS <br />6,700 <br />$6,700 <br />Materials/Laborato <br />1 LS <br />95,000 <br />$95,000 <br />Management <br />32 hrs <br />125per/hr <br />$4,000 <br />Analysis <br />80 hrs <br />100per/hr <br />1 <br />$8,000 <br />Reporting <br />1 LS <br />25,000 <br />$25,000 <br />Subtotal <br />$157,693 <br />3 <br />GROUNDWATER TREATMENT SYSTEM 3 <br />System Operation and Maintenance <br />Operation <br />1 LS <br />7200 <br />$7,200 <br />Labor <br />24 hrs <br />45.21per/hr <br />$1,085 <br />Materials <br />1 LS <br />10,000 <br />$10,000 <br />Subtotal <br />$18,285 <br />4 <br />LEACHATE MANAGEMENT SYSTEM 4 <br />System Maintenance/Repair <br />Ins ection <br />8 hrs <br />45.21per/hr <br />$362 <br />Labor <br />16 hrs <br />45.21per/hr <br />$723 <br />Equipment <br />1 LS <br />1,200 <br />$1,200 <br />Materials <br />1 LS <br />2,500 <br />$2,500 <br />S stem Monitoring <br />Labor <br />8 hrs <br />45.21 <br />perthr <br />$362 <br />Equipment <br />1 LS <br />500 <br />$500 <br />Materials/Laboratory <br />1 LS <br />7,500 <br />$1,000 <br />Mana ement <br />4 hrs <br />125 <br />per/hr <br />$500 <br />Anal sis <br />8 hrs <br />100er/hr <br />$800 <br />Re ortin <br />1 LS <br />5,000 <br />$5,000 <br />Subtotal <br />$12,947 <br />Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Table 9 Post Clos Est <br />Amend. No. 4:8/7/2008 Page 1 of 3 <br />