|
v
<br />TABLEā¢
<br />FORWARD LANDFILL
<br />ANNUAL POST -CLOSURE MAINTENANCE AND MONITORING
<br />COST ESTIMATE SUMMARY
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit Price
<br />($) 1
<br />Total
<br />($)
<br />1
<br />LANDFILL GAS CONTROL (1)
<br />System Maintenance/Repair
<br />Inspection
<br />64 hrs
<br />45.21per/hr
<br />$2,893
<br />Labor
<br />200 hrs
<br />45.21per/hr
<br />$9,042
<br />Equipment
<br />1 LS
<br />10,250
<br />$10,250
<br />Materials
<br />1 LS
<br />44,800
<br />$44,800
<br />S stem Monitoring/Testing
<br />Flare - Source Testing
<br />1 LS
<br />22,000
<br />$22,000
<br />Labor
<br />160 hrs
<br />45.21per/hr
<br />$7,234
<br />Equipment
<br />1 LS
<br />7,000
<br />$7,000
<br />Materials/Laborato
<br />1 LS
<br />20,000
<br />$20,000
<br />Management
<br />60 hrs
<br />125per/hr
<br />$7,500
<br />Reporting
<br />1 LS
<br />15,000
<br />$15,000
<br />Subtotal
<br />$145,719
<br />2
<br />GROUNDWATER MONITORING SYSTEM 2
<br />System Maintenance/Repair
<br />Inspection
<br />32 hrs
<br />45.21
<br />perthr
<br />$1,447
<br />Labor
<br />60 hrs
<br />45.21per/hr
<br />$2,713
<br />Equipment
<br />1 LS
<br />2,500
<br />$2,500
<br />Materials
<br />1 LS
<br />5,100
<br />$5,100
<br />System Monitoring
<br />Labor
<br />160 hrs
<br />45.21
<br />2er/hr
<br />$7,234
<br />E ui ment
<br />1 LS
<br />6,700
<br />$6,700
<br />Materials/Laborato
<br />1 LS
<br />95,000
<br />$95,000
<br />Management
<br />32 hrs
<br />125per/hr
<br />$4,000
<br />Analysis
<br />80 hrs
<br />100per/hr
<br />1
<br />$8,000
<br />Reporting
<br />1 LS
<br />25,000
<br />$25,000
<br />Subtotal
<br />$157,693
<br />3
<br />GROUNDWATER TREATMENT SYSTEM 3
<br />System Operation and Maintenance
<br />Operation
<br />1 LS
<br />7200
<br />$7,200
<br />Labor
<br />24 hrs
<br />45.21per/hr
<br />$1,085
<br />Materials
<br />1 LS
<br />10,000
<br />$10,000
<br />Subtotal
<br />$18,285
<br />4
<br />LEACHATE MANAGEMENT SYSTEM 4
<br />System Maintenance/Repair
<br />Ins ection
<br />8 hrs
<br />45.21per/hr
<br />$362
<br />Labor
<br />16 hrs
<br />45.21per/hr
<br />$723
<br />Equipment
<br />1 LS
<br />1,200
<br />$1,200
<br />Materials
<br />1 LS
<br />2,500
<br />$2,500
<br />S stem Monitoring
<br />Labor
<br />8 hrs
<br />45.21
<br />perthr
<br />$362
<br />Equipment
<br />1 LS
<br />500
<br />$500
<br />Materials/Laboratory
<br />1 LS
<br />7,500
<br />$1,000
<br />Mana ement
<br />4 hrs
<br />125
<br />per/hr
<br />$500
<br />Anal sis
<br />8 hrs
<br />100er/hr
<br />$800
<br />Re ortin
<br />1 LS
<br />5,000
<br />$5,000
<br />Subtotal
<br />$12,947
<br />Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Table 9 Post Clos Est
<br />Amend. No. 4:8/7/2008 Page 1 of 3
<br />
|