Laserfiche WebLink
C] <br />TABLE 9 <br />FORWARD LANDFILL <br />ANNUAL POST -CLOSURE MAINTENANCE AND MONITORING <br />COST ESTIMATE SUMMARY <br />Item <br />No. <br />5 <br />Description <br />STORMWATER MONITORING (5) <br />System Monitoring <br />Quantity <br />Unit Price <br />($) <br />Total <br />($) <br />Labor <br />8 hrs <br />45.21per/hr <br />$362 <br />Eq ui ment <br />1 LS <br />400 <br />$400 <br />Materials/Laboratory <br />1 LS <br />2,250 <br />$2,250 <br />Management <br />2 hrs <br />125per/hr <br />$250 <br />Analysis <br />4 hrs <br />100per/hr <br />$400 <br />Reporting <br />1 LS <br />2,500 <br />$2,500 <br />Subtotal <br />$6,162 <br />6 <br />FINAL COVER SYSTEM 6 <br />System Maintenance/Repair <br />Inspection <br />8 hrs <br />45.21per/hr <br />$362 <br />Labor <br />40 hrs <br />45.21per/hr <br />$1,808 <br />Equipment <br />1 LS <br />15,400 <br />$15,400 <br />Materials <br />1 LS <br />27,500 <br />$27,500 <br />Subtotal <br />$45,070 <br />7 <br />LANDFILL SETTLEMENT MONITORING AND MONUMENT MAINTENANCE <br />Inspection/Maintenance <br />Labor <br />16 hrs <br />45.21per/hr <br />$723 <br />Materials $900 to replace every 3 ears <br />- <br />300 LS <br />$300 <br />Aerial Survey Once every 5 ears $14,000/5 rs <br />- <br />2,800 LS <br />$2,800 <br />Settlement Re ort <br />En ineer <br />8 hrs <br />100 per/hr <br />$800 <br />8 <br />VEGETATIVE COVER INSPECTION 7 <br />Subtotal <br />$4,623 <br />Vegetation <br />Inspection <br />16 hrs <br />45per/hr <br />$723 <br />H roseed/Soil Amendments <br />1 acres <br />4,680 ac <br />$4,680 <br />Rodent Control <br />32 hrs <br />45.21 er/hr <br />$1,447 <br />Wee /Dust and Fire Control <br />64 hrs <br />45.21 er/hr <br />$2,893 <br />Subtotal <br />$9,744 <br />9 <br />ACCESS ROAD MAINTENANCE 8 <br />Road Maintenance/Repair <br />Inspection <br />8 hrs <br />45.21per/hr <br />$362 <br />Labor <br />16 hrs <br />45.21per/hr <br />$723 <br />Equipment <br />1 LS <br />3,060 <br />$3,060 <br />Materials <br />1 LS <br />7,000 <br />$7,000 <br />Subtotal <br />$11,145 <br />10 <br />DRAINAGE CONTROL SYSTEM 9 <br />System Maintenance/Repair <br />Inspection <br />32 hrs <br />45.21per/hr <br />$1,447 <br />Labor <br />64 hrs <br />45.21 ptElL <br />$2,893 <br />Eq ui ment <br />1 LS <br />0 <br />$0 <br />Materials <br />1 LS <br />10,765 <br />$10,765 <br />Subtotal <br />$15,105 <br />Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Table 9 Post Clos Est <br />Amend. No. 4:8/7/2008 Page 2 of 3 <br />