My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-08 October 2008 <br /> Forward Landfill Project No.021605.08 <br /> 5.4.5 Repair <br /> The geotextile materials were checked for defects during deployment and holes or <br /> tears were identified and repaired prior to placement of the cover materials. <br /> 5.5 Geocomposite <br /> 5.5.1 General <br /> A geocomposite drainage layer was placed as part of the LCRS for the side slopes of <br /> WMU FU-08. The geocomposite consists of a non-woven geotextile fused on one side <br /> of the HDPE geonet. Existing geocomposite from WMU FU-06 material was used <br /> in FU-08. The MQC certifications and conformance test results for this material <br /> were reviewed and approved during FU-06 construction and the documentation for <br /> these rolls is included in the Final Report for FU-06. <br /> 5.5.2 Deployment <br /> The panel deployment procedure was observed and documented by Vector's C <br /> Monitor. The C Monitor observed that the conditions of the C manual were <br /> met during deployment. Vector's CA Monitor continuously observed deployment <br /> activities to ensure no damage occurred to the underlying components. <br /> The seam overlap, seaming, tie-ins, and other manufacturer's written guidelines <br /> were followed. Vector's CQA Monitor observed that the components of the <br /> geocomposite (geotextile-geonet) were not bonded at the edges of the rolls to allow <br /> for the geonet ties. <br /> 5.5.3 Repair <br /> The materials were checked for defects during deployment and holes or tears were <br /> identified and repaired prior to placement of the cover materials. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -33- <br />
The URL can be used to link to this page
Your browser does not support the video tag.