My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009_11
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2009_11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:15:04 PM
Creation date
7/3/2020 10:54:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009_11
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2009_11.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
evaporated or used in the initial mixing of the compost. Excess water with acceptable <br /> water quality will be discharged to the South Fork in compliance with the applicable <br /> storm water regulations. Excess water with unacceptable water quality for <br /> discharge to the South Fork will either be pumped into the onsite leachate evaporation <br /> pond in the North Area, or transported to a local municipal treatment facility. <br /> 1.2 Site Location <br /> 1.2.1 Site Location Map <br /> Provide a site location map which shows the exact location of the facility and includes <br /> the names of all access roads. Property boundaries should be delineated by township, <br /> range, and section. The physical address for the Forward site is 9999 South Austin <br /> Road, Manteca in San Joaquin County, California. The Compost Facility will be <br /> located in the southern portion of the property. The site is located in Section 3 of <br /> Township 1S, Range 7E, Mount Diablo Base-line and Meridian as shown of Figure 2. <br /> Access to the site is from Austin Road a rural two-lane, paved road oriented north/south <br /> connecting Mariposa Road to the north and ultimately connecting with Highway 99 to the <br /> south. Direct routes to Austin Road are provided by French Camp Road, Arch Road, <br /> Mariposa Road, Interstate 5, Highway 99, and Highway 120. <br /> There are three entrances to the site, all from Austin Road. The main entrance to <br /> the landfill is a 50-foot-wide paved road located at the northeast corner of the <br /> property. A secondary access road to the landfill is a 15-foot-wide gravel road located <br /> north of the South Fork. The entrance to the RRF and proposed Compost Facility is <br /> located about approximately 1,600 feet south of the main landfill entrance, south of <br /> the South Fork. The two roads on either side of the South Fork are easement <br /> maintenance roads. Current traffic flow is not impeded during site operations. <br /> 1.2.2 Site Facilities/Features <br /> These facilities/features apply to the site as a whole, inclusive of the landfill, RRF, <br /> and Compost Facility. <br /> Sanitary Facilities. <br /> There are no on-site sewage disposal system or leach lines. The sanitary facilities consist <br /> of a total of eight toilets at the site. Two portable toilets are located adjacent to the <br /> landfill office trailer, two are located within the office trailer, two are located at the <br /> RRF, one is in the maintenance yard at the landfill, and one is located on the bin storage <br /> pad at the landfill. The two portable toilets adjacent to the landfill office and the two toilets <br /> inside the office trailer are handicap-accessible. The locations will change with site <br /> development. <br /> Electricity. Pacific Gas and Electric Company (PG&E) provides primary electric service to the <br /> site. Electric power is provided to the office trailers (except the employee trailer at the RRF) <br /> and on site pumping facilities. <br /> Communications. AT&T provides telephone service to the site. Company offices and <br /> some vehicles operations are equipped with phones. Two-way radios and cell phones are <br /> also provided to personnel. <br /> Forward Composting Facility RCSI <br /> 7/20/09;Page 2 SWT Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.