My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ausenco <br />0 Vector <br />■ <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward WMU FU -10 <br />USVC0004800 <br />003 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton, CA <br />Republic. Services, Inc. <br />June 30, 2010 <br />Wednesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Kevin Turner <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Native silty-srdy silty-sandyclays, E side of cell <br />Clear, It. breeze W, 700-950 F <br />Michael Strobel <br />Equipment on site: <br />5x637 scra rs, 143H blade, D6 dozer, 815 corn actor, 321C excavator, 3 water trucks <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />I. Construction Activities <br />1. Guinn Construction completed placement of the Subgrade Fill soils above the bench on the 5:1 slope. <br />Four 637 scrapers placed horizontal fills in 8" loose lifts. Each lift was moisture conditioned by a <br />water truck and compaction achieved by the 815 sheepsfoot. The D6 completed rough finish grading <br />in the upper -slope areas. The contractor estimates about 13,000cy have been placed on the slope in <br />2.5 days of placement. <br />2. Guinn Construction started placement of Subgrade Fill soils on the floor area of FU -10. Four scrapers <br />continue placing 8" loose lifts followed by moisture conditioning and compaction by the 815 <br />sheepsfoot. The contractor estimates about 2,500cy was placed on the floor this afternoon. <br />•• Activities <br />1. CQA started review of the project plans and specifications. <br />2. CQA performed 3 nuclear method moisture -density tests in compacted Subgrade Fill placed in the <br />upper areas of the 5:1 slope; tests SF -I, SF -2 and SF -3 indicated passing results. <br />3. CQA collected Subgrade Fill sample SFS -1 from material placed on the 5:1 slope for ASTM D1557 <br />Proctor 11 wash with sieve analysis and Atterberg Limits determination. <br />MonteWith • • online foremail; make minor <br />corrections to Daily Report001, Monday,119 <br />Prepared By: Michael Strobel <br />06/30/10 <br />1 of 1 <br />C-2 <br />Reviewed By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.