My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ausenco <br />Vector <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward WU FU -10 <br />USVC0004800 <br />004 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton, CA <br />Re ublic Services, Inc. <br />July 1, 2010 <br />Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Kevin Turner <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Native silty -sand clays, E side of cell <br />I Clear, It. breeze W, 560-880 F <br />Michael Strobel <br />Equipment on site: <br />5x637 scrapers, 143H blade, D6 dozer, 815 compactor, 321C excavator, 3 water trucks <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction <br />1. Guinn Construction continued placement of Subgrade Fill soils on the floor area of FU- 10. Four <br />scrapers continue placing 8" loose lifts followed by moisture conditioning, with additional mixing <br />• compaction by { ••t. The contractor estimates about 111 placed on <br />floor and lower slope this afternoon; about 7,500cy to date. The east 1/4of the floor is at about FG; the <br />central 1/4floor area needs.'{• of and the 1/4section of ••needs <br />.r• of • of •• Subgrade .{ place fromprevious <br />construction. The 143H blade • roadways throughoutday as needed. <br />2. Guinn Construction started exposing the tie-in along the south end of FU -08 (filter geotextile and <br />LCRS •rain gravel). The contractor• { a spotter• • •' <br />the southernmost leachate collection <br />3. Guinn Construction used the D. to rip the upper•{ •ng the south sideof 1 <br />will be used for Subgrade Fill on the floor areas. <br />4. Guinn Construction started fill placement for the lower slope below the bench and 5:1 slope. The D6 <br />keyed into existing side slope material and the footprint was moisture conditioned and worked by the <br />815. Scrapers <br />compaction <br />{.'• by <br />- 815. <br />11. • 1 Activities <br />1. CQA continued review of the project plans and specifications. <br />2. CQA performed 6 nuclear method moisture -density tests in compacted Subgrade Fill placed in the <br />east { central floorof i • • indicated passing <br />3. •'. started preparation of {g .{ • for D1557A Proctor,11 wash with <br />sieve analysis { Atterberg Limit determination. <br />111. Co,,fversatio-cLs <br />Prepared y: Michael Strobel <br />07/01/10 <br />1ofl <br />C-2 <br />Reviewed By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.