Ausenco <br />Vector <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward WU FU -10 <br />USVC0004800 <br />004 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton, CA <br />Re ublic Services, Inc. <br />July 1, 2010 <br />Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Kevin Turner <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Native silty -sand clays, E side of cell <br />I Clear, It. breeze W, 560-880 F <br />Michael Strobel <br />Equipment on site: <br />5x637 scrapers, 143H blade, D6 dozer, 815 compactor, 321C excavator, 3 water trucks <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction <br />1. Guinn Construction continued placement of Subgrade Fill soils on the floor area of FU- 10. Four <br />scrapers continue placing 8" loose lifts followed by moisture conditioning, with additional mixing <br />• compaction by { ••t. The contractor estimates about 111 placed on <br />floor and lower slope this afternoon; about 7,500cy to date. The east 1/4of the floor is at about FG; the <br />central 1/4floor area needs.'{• of and the 1/4section of ••needs <br />.r• of • of •• Subgrade .{ place fromprevious <br />construction. The 143H blade • roadways throughoutday as needed. <br />2. Guinn Construction started exposing the tie-in along the south end of FU -08 (filter geotextile and <br />LCRS •rain gravel). The contractor• { a spotter• • •' <br />the southernmost leachate collection <br />3. Guinn Construction used the D. to rip the upper•{ •ng the south sideof 1 <br />will be used for Subgrade Fill on the floor areas. <br />4. Guinn Construction started fill placement for the lower slope below the bench and 5:1 slope. The D6 <br />keyed into existing side slope material and the footprint was moisture conditioned and worked by the <br />815. Scrapers <br />compaction <br />{.'• by <br />- 815. <br />11. • 1 Activities <br />1. CQA continued review of the project plans and specifications. <br />2. CQA performed 6 nuclear method moisture -density tests in compacted Subgrade Fill placed in the <br />east { central floorof i • • indicated passing <br />3. •'. started preparation of {g .{ • for D1557A Proctor,11 wash with <br />sieve analysis { Atterberg Limit determination. <br />111. Co,,fversatio-cLs <br />Prepared y: Michael Strobel <br />07/01/10 <br />1ofl <br />C-2 <br />Reviewed By: <br />