2 PROPOSED PROJECT <br /> 2.1 General <br /> Ameresco is proposing to construct an LFGTE facility at Forward Landfill to convert collected <br /> LFG to electrical power. The LFGTE facility is proposed to be located near the existing LFG <br /> flare at Forward Landfill. The LFGTE facility will produce energy from the LFG generated at <br /> Forward Landfill using two (2) new LFG fired internal combustion (IC) engine units. Each <br /> engine will be sized to utilize a maximum of 942 standard cubic feet per minute (scfm) of LFG <br /> and produce approximately 2.18 Megawatts (MW) of electric power at full load. Ameresco is <br /> also proposing to install a new, small, high temperature, enclosed ABUTEC flare associated with <br /> the LFG pretreatment system for the IC engine units. The flare will burn the off gas from the <br /> regeneration of the Siloxane pretreatment system, which will be used to purify the gas for the IC <br /> engines. <br /> The existing LFG enclosed flare will continue to be the primary control device for the landfill <br /> but will not operate when the LFGTE facility is operating except to burn excess LFG beyond <br /> what the engines can handle. The flare will also provide backup LFG combustion capacity in the <br /> event that both engines are off-line. At this time it is expected that the existing Covanta LFGTE <br /> facility at the site will also continue to operate and will collect and convert LFG from its current <br /> well field. <br /> 2.2 Facility Layout <br /> Figure 2-1 is a Vicinity Map that depicts the proposed LFGTE facility in relation to the entire <br /> ' Forward Landfill property. The proposed LFGTE Facility will be located directly east of the <br /> existing flare. <br /> Figure 2-2 is a Site Plan. An approximately 50-ft by 70-ft building is proposed to house an <br /> office, the LFGTE engines, electrical switchgear, and other ancillary equipment. In addition, an <br /> outdoor concrete pad area will be located adjacent to the building on which skid-mounted <br /> equipment, an electrical transformer and a flare will be placed. <br /> Sanitary facilities will be provided in the form of a Wells Cargo Comfort Elite ADAI (or <br /> similar) self-contained restroom facility, which will be serviced on a routine basis. Power will <br /> be provided by the LFGTE facility. Potable water needs are limited and will be supplied by <br /> existing water wells at Forward or by purchased bottled water. <br /> The LFGTE engine dimensions will be approximately 9.2-ft high, 7.5-ft wide, and 32.5-ft long. <br /> The planned stack height for each engine will be 40-ft above ground with a diameter of 20- <br /> inches. The ABUTEC enclosed flare has a height of approximately 50-ft. <br /> C:\Documents and Settingsyessica.sees\Desktofforwud LFGTE-Roject Description.doc <br /> CORNERSTONE 2-1 LEWIS ENGINEERING <br /> E-9...m..e.l G...P.LLC <br />