Laserfiche WebLink
0 <br />April 8, 2014 <br />Workers will not be allowed to eat near the active landfill. <br />Current Status: The landfill does not accept hazardous waste. As discussed in <br />the Joint Technical Document, Forward Land (BAS et al., 2003) (JTD) all <br />employees are given training that complies with the Use Permit conditions <br />regarding the potential for exposure to hazardous materials. <br />Dust control procedures specified in the Site Operations Plan (section 7.7.5 of <br />the JTD) are being utilized. Dust is measured periodically in accordance <br />with SJVUAPCD requirements. <br />Workers who have had direct contact with waste, or who have performed <br />operations that may involve direct contact with wastes (such as equipment <br />maintenance or asbestos handling), wear disposable clothing or change <br />clothing before leaving the site. The potentially contaminated clothing is <br />cleaned or disposed as appropriate. <br />A portable decontamination facility with self-contained water supply for <br />personnel and equipment is available at the site. <br />The Asbestos -Containing Materials (ACM) handling program, including <br />training programs, is provided in the JTD and complies with the Use Permit <br />requirements. <br />A lunch room is provided at the site and workers are not allowed to eat near <br />the active landfill. <br />c. 32 Austin 1994 (0.0, Austin 2000 (L1.0 <br />Working clothes should be left behind at the landfill and cleaned by the, <br />operator, <br />Changing areas should be provided at the project site so that workers do <br />not cavy material off-site, and <br />Dust accumulated on non -washable items should be removed by <br />vacuuming, not brushing or blowing. <br />Current Status: Forward employs a laundry service for washing employees <br />working clothes. Changing areas are provided onsite. A cleaning service <br />periodically vacuums dust on non -washable items in Forward's onsite office. <br />d. 33 (E.2) <br />Proposed as�Part of the Project: <br />The Forward Landfill "load -checking program," which- is designed to <br />mitigate against- hazardous waste being placed in the landfill, will continue <br />to be implemented for the consolidated landfill. <br />Page 13 <br />