My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Construction Quality Assurance Report — WMU FU -13 <br />Forward Landfill <br />• TABLE 5 <br />GCL CONFORMANCE TESTING SUMMARY <br />5.2.3 GCL Installation <br />5.2.3.1 GCL Deployment <br />GCL was deployed on the 4:1 slope, bench, and 2:1 slope of FU -13. GLA's CQA Monitor activities <br />during GCL deployment included observing the installer's activities, filling out field forms for <br />Subgrade Acceptance and Deployment Logs, and ensuring compliance with the Specifications. <br />• Field Panel identification: Prior to GCL deployment, GLA's CQA Monitor and the <br />• <br />superintendent for the liner installer, Camanco, discussed the labeling of the material. It was <br />agreed to the number each separate panel sequentially, including the factory roll number and <br />the day's date. Field sketches of each day's deployment were produced and maintained by <br />GLA's CQA Monitor. Comanco also prepared a panel deployment drawing that was reviewed by <br />GLA. This information can be found in Appendix H. <br />Field Panel Placement: The GCL deployed on the 4:1 slopes were full panels from the anchor <br />trench to bench, where the GCL was over lapped 7 feet according to Detail E on Sheet 5 of the <br />Plans; and full panels from the bench to the bottom of the 2:1 slope. During deployment, <br />granular bentonite was spread along the inside edge of each seam and the GCL overlapped 1 <br />foot according to the requirements in the Plans and Specifications. During GCL deployment, <br />GLA's CQA Monitor recorded information in the GCL Deployment Logs. To protect the GCL from <br />hydration, the material was covered the same day as it was deployed with HDPE liner, in the <br />event of rainy weather that could possibly damage the GCL. The GCL panel Deployment Logs <br />and as -built drawings are presented in Appendix H. <br />19 Geo -Logic <br />ASSOCIATES <br />TEST RESULTS <br />ASTM D4632 <br />ASTM D 5993 <br />ASTM D 5887 <br />SAMPLE <br />PEEL STRENGTH <br />MASS PER UNIT AREA <br />HYDRAULIC CONDUCTIVITY <br />NO. <br />(LBS) <br />(LBS/FT2) <br />(CM/SEC) <br />P/F <br />SPECS <br />35(min.) <br />0.75 @ 0% M.C. <br />5 x 10-9 (max.) <br />-- <br />502224294 <br />58.5 <br />0.76 <br />3.4 x 10 9 <br />P <br />502224325 <br />37.4 <br />0.85 <br />2.7 x 10 9 <br />P <br />502224378 <br />45.4 <br />0.88 <br />2.6 x 10-9 <br />P <br />5.2.3 GCL Installation <br />5.2.3.1 GCL Deployment <br />GCL was deployed on the 4:1 slope, bench, and 2:1 slope of FU -13. GLA's CQA Monitor activities <br />during GCL deployment included observing the installer's activities, filling out field forms for <br />Subgrade Acceptance and Deployment Logs, and ensuring compliance with the Specifications. <br />• Field Panel identification: Prior to GCL deployment, GLA's CQA Monitor and the <br />• <br />superintendent for the liner installer, Camanco, discussed the labeling of the material. It was <br />agreed to the number each separate panel sequentially, including the factory roll number and <br />the day's date. Field sketches of each day's deployment were produced and maintained by <br />GLA's CQA Monitor. Comanco also prepared a panel deployment drawing that was reviewed by <br />GLA. This information can be found in Appendix H. <br />Field Panel Placement: The GCL deployed on the 4:1 slopes were full panels from the anchor <br />trench to bench, where the GCL was over lapped 7 feet according to Detail E on Sheet 5 of the <br />Plans; and full panels from the bench to the bottom of the 2:1 slope. During deployment, <br />granular bentonite was spread along the inside edge of each seam and the GCL overlapped 1 <br />foot according to the requirements in the Plans and Specifications. During GCL deployment, <br />GLA's CQA Monitor recorded information in the GCL Deployment Logs. To protect the GCL from <br />hydration, the material was covered the same day as it was deployed with HDPE liner, in the <br />event of rainy weather that could possibly damage the GCL. The GCL panel Deployment Logs <br />and as -built drawings are presented in Appendix H. <br />19 Geo -Logic <br />ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.