My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Construction Quality Assurance Report-WMU FU -13 <br />Forward Landfill <br />5.3.3.2 Repair Procedures and Testing <br />The repairs were conducted in accordance with the applicable method specified within the <br />project Specifications. GLA's CQA Monitor reviewed each repair and verified that subsequent <br />testing was performed. These Repair Logs are presented in Appendix I. <br />5.3.4 Leak Location Survey <br />A leak location survey was conducted twice during the construction of WMU FU -13. The first <br />leak location survey was performed on the 60 -mil DST HDPE geomembrane deployed on the <br />floor of FU -13, prior to the placement of the cushion geotextile. The second leak location <br />survey was performed on the floor of FU -13 upon completion of the operations layer soils <br />placement. GLA engineers conducting the leak tests found no holes during either of the leak <br />tests. A complete report of the leak testing procedure and findings of the leak location surveys <br />is included in Appendix J. <br />5.4 GEOTEXTILE <br />5.4.1 General <br />A 12 oz/yd2 cushion geotextile was used on the floor between the HDPE geomembrane and <br />LCRS granular drainage material. An 8 oz/yd2 filter geotextile was used as a separation layer <br />(filter) between the LCRS Granular Drainage material (GD) and the Operations Layer soils. It was <br />also used in the LCRS trenches to encapsulate the coarse gravel and perforated HDPE piping. <br />5.4.2 Receiving Inspection <br />Upon arrival by truck, GLA's CQA Monitor observed the unloading and storage of each roll of <br />geotextile. Each roll of geotextile was recorded in the Receiving Logs by roll number and <br />crosschecked against the manufacturer's quality control documents (MQC certificates) provided <br />by the manufacturer. Following inspection of the rolls and review of the MQC certificates, the <br />material was approved for deployment. A copy of the Geotextile Receiving Logs and the <br />manufacturer's quality control data are included in Appendix K. <br />During deployment of the 8 oz/yd2 filter geotextile on the top deck area above the 4:1 slope, <br />the installer ran out of material. Forward was able to utilize additional geocomposite material <br />from the project. In addition, some of the geocomposite was also used as a cushion layer for a <br />small portion of the cell floor. <br />26 Geo -Logic <br />ASSOCIATES <br />0 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.