Laserfiche WebLink
1-11 <br /> operations. However, once the entire FL is closed (after the last staged closure area is <br /> completed), the 30-year post-closure maintenance period will begin. The back-up <br /> data/documentation in support of the post-closure cost estimate is included in Attachment <br /> 3. <br /> The operater well initiate post clesure maintenance activities as the staged closure ef the Fl- <br /> a s implemented. The eperater's understanding is that a minimum of the last therty (30) years <br /> of post closure maintenance must be funded. TheFefore, the ongoing post closure obligati <br /> undeF state law will eentonue fE)F of 30 years after the Stage Vill closure area is <br /> eem p leted <br /> 1.10 Demonstration of Financial Assurance <br /> Closurea4+d-/Post-Closure/Corrective Action Maintenance Fund <br /> In accordance with 27 CCR, Chapter 6 and 40 CFR, Subpart G, an operator must <br /> demonstrate financial assurance for the proper closure, post-closure maintenance, and <br /> corrective action for reasonably foreseeable releases at a landfill. The financial assurance <br /> mechanism documentation in-place for the FL is included in the 2013 JTD as Appendix C.Aa <br /> Insurance Policy deirnenstrating eeveFage fGF GIGSUFe and post clesure Fnaintenanee costs <br /> has been evaluated and approved by the GIWIVIB for the FL. This closure cest estimate is <br /> reflected 200 dollars and nronnred in nnn n with 77 GGR regulations. —Upon <br /> approval of this Amendment (Amendment No. 43), the closure Gcost€estimate presented in <br /> Table 3 will serve as the basis for closure funding utilizing an approval financial assurance <br /> mechanism. It should be noted that a Non-Water Release Corrective Action Plan (NWRCAP) <br /> for FL (GLA, 2011) was submitted to the regulatory agencies and approved by CalRecycle in <br /> 2012. Based on the 2011 NWRCAP, the FL will maintain costs associated with the reasonably <br /> foreseeable release to groundwater for the basis of the corrective action financial assurance in <br /> accordance with 27 CCR, Section 22221. A copy of the NWRCAP is included as Attachment 4. <br /> 1.11 California Environmental Quality Act Documentation (CEQA <br /> As discussed above, stand alone Partial FCPCMP Final Closure Plans have been and will be <br /> prepared in advance of each closure area stagel. The operator will comply with CEQA and <br /> evaluate potential impacts associated with each staged closure project. Appropriate CEQA <br /> documentation will be prepared in support of obtaining agency approval of the Partial Final <br /> Glesure PI FCPCMPs. <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\appendices\app a-pcpcmp 2013\text\pcpcmp amend <br /> 2013.doc <br />