My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-4 <br /> ®rvnfiia^�®rl_r.c A}�>±nh ®rah °I <br /> Stage 11 <br /> Stage II is a 5.6-acre area as shown on Figure 2. This area includes the final fill slopes along <br /> the southern slopes of the northern portion of the landfill up to an elevation of 150 feet <br /> AMSL. The closure volume estimates are based on waste fill up to an elevation of 150 feet <br /> AMSL down to master plan base grades. As part of this project, the area will be cleared and <br /> grubbed, as necessary, and the closure improvements constructed (e.g., final cover, <br /> permanent drainage, landfill gas system modification, etc. <br /> Stage III <br /> Stage III is a 5.9-acre area as shown on Figure 3. This area includes the final fill slopes <br /> adjacent to Stage II along the southern slopes of the northern portion of the landfill to an <br /> elevation of 150 feet AMSL. The closure volume estimates are based on waste fill up to an <br /> elevation of 150 feet AMSL down to the master plan base grades. As part of this project, the <br /> area will be cleared and grubbed, as necessary, and the closure improvements constructed <br /> (e.g., final cover, permanent drainage, landfill gas system modification, etc.). <br /> Stage IV <br /> Stage IV is a 13.7-acre area as shown on Figure 4. This area includes the final fill slopes <br /> located between Stages III and I and along the northern slopes up to an elevation of 150 <br /> feet AMSL. The closure volume estimates are based on waste fill up to an elevation of 150 <br /> feet AMSL down to the master plan base grades. As part of this project, the area will be <br /> cleared and grubbed, as necessary, and the closure improvements constructed (e.g., final <br /> cover, permanent drainage, landfill gas system modification, etc.). <br /> Stage V <br /> Stage V is an 11.8-acre area as shown on Figure 5. This area includes final fill slopes along <br /> the northeast of the northern portion of the landfill up to an elevation of 90 feet AMSL. The <br /> closure volume estimates are based on the top of waste fill plan down to the master plan <br /> base grades. As part of this project, the area will be cleared and grubbed, as necessary, and <br /> the closure improvements constructed (e.g., final cover, permanent drainage, landfill gas <br /> system modification, etc.). <br /> Stage VI <br /> Stage VI is a 20.7-acre area as shown on Figure 6. This area includes the northern final fill <br /> slopes adjacent to Stages I, IV, and V up to an elevation of 150 feet AMSL. The closure <br /> volume estimates are based on the top of waste fill plan down to the master plan base <br /> grades. As part of this project, the area will be cleared and grubbed, as necessary, and the <br /> closure improvements constructed (e.g., final cover, permanent drainage, landfill gas system <br /> modification, etc.). <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\appendices\app a-pcpcmp 2013\text\pcpcmp amend <br /> 2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.