My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-5 <br /> Stage VII <br /> Stage VII is a 166.7-acre area as shown on Figure 7. This area includes the entire deck area <br /> of the landfill up to an elevation of 200 feet AMSL. The closure volume estimates are based <br /> on a "flat deck" at an elevation of 200 feet AMSL down to the master plan base grades. As <br /> part of this project, the area will be cleared and grubbed, as necessary, and the closure <br /> improvements constructed (e.g., final cover, permanent drainage, landfill gas system <br /> modification, etc.). <br /> Stage VIII <br /> Stage VIII is a 24.1-acre area as shown on Figure 8. This area includes the entire deck and <br /> slope area of the southern most portion of the landfill. The closure volume estimates are <br /> based on a "flat deck" down to the master plan base grades. As part of this project, the <br /> area will be cleared and grubbed, as necessary, and the closure improvements constructed <br /> (e.g., final cover, permanent drainage, landfill gas system modification, etc.). <br /> 1.3 Maximum Extent of Landfill That Will Ever Require Closure <br /> In accordance with 27 CCR, Section 21790(b)(6), Tthe maximum extent of the landfill that <br /> will ever require closure at any given time during the life of the landfill is approximately <br /> 187 acres sence Stage 1A paFtial fiRal elesuFe eenstmetion was eompleted OR 20 . Table <br /> 1 presents the anticipated staged closure acreages versus the liner development phases to <br /> show the maximum extent that would ever require closure. As shown, liner development <br /> Phases 1, 2, 3 and 4 would be completed before the Stage I closure is implemented <br /> creating the basis for maximum extent. <br /> The site's closure staging was developed so as to not interfere with active disposal <br /> operations. <br /> 1.4 Closure Implementation <br /> A closure implementation schedule for the FL will be presented in each Partial FCPCMP€na4 <br /> Slesure-as phased closure is implemented. Closure construction will begin with mobilization <br /> of equipment and materials. The type of equipment and required personnel expected to be <br /> utilized during closure construction includes, but is not limited to, the following: <br /> Equipment <br /> — Scrapers <br /> — Dozers <br /> — Loaders <br /> — Compactors <br /> — Trucks <br /> — Soil Processing Equipment <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\appendices\app a-pcpcmp 2013\te)t\pcpcmp amend <br /> 2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.