1-5 <br /> Stage VII <br /> Stage VII is a 166.7-acre area as shown on Figure 7. This area includes the entire deck area <br /> of the landfill up to an elevation of 200 feet AMSL. The closure volume estimates are based <br /> on a "flat deck" at an elevation of 200 feet AMSL down to the master plan base grades. As <br /> part of this project, the area will be cleared and grubbed, as necessary, and the closure <br /> improvements constructed (e.g., final cover, permanent drainage, landfill gas system <br /> modification, etc.). <br /> Stage VIII <br /> Stage VIII is a 24.1-acre area as shown on Figure 8. This area includes the entire deck and <br /> slope area of the southern most portion of the landfill. The closure volume estimates are <br /> based on a "flat deck" down to the master plan base grades. As part of this project, the <br /> area will be cleared and grubbed, as necessary, and the closure improvements constructed <br /> (e.g., final cover, permanent drainage, landfill gas system modification, etc.). <br /> 1.3 Maximum Extent of Landfill That Will Ever Require Closure <br /> In accordance with 27 CCR, Section 21790(b)(6), Tthe maximum extent of the landfill that <br /> will ever require closure at any given time during the life of the landfill is approximately <br /> 187 acres sence Stage 1A paFtial fiRal elesuFe eenstmetion was eompleted OR 20 . Table <br /> 1 presents the anticipated staged closure acreages versus the liner development phases to <br /> show the maximum extent that would ever require closure. As shown, liner development <br /> Phases 1, 2, 3 and 4 would be completed before the Stage I closure is implemented <br /> creating the basis for maximum extent. <br /> The site's closure staging was developed so as to not interfere with active disposal <br /> operations. <br /> 1.4 Closure Implementation <br /> A closure implementation schedule for the FL will be presented in each Partial FCPCMP€na4 <br /> Slesure-as phased closure is implemented. Closure construction will begin with mobilization <br /> of equipment and materials. The type of equipment and required personnel expected to be <br /> utilized during closure construction includes, but is not limited to, the following: <br /> Equipment <br /> — Scrapers <br /> — Dozers <br /> — Loaders <br /> — Compactors <br /> — Trucks <br /> — Soil Processing Equipment <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\appendices\app a-pcpcmp 2013\te)t\pcpcmp amend <br /> 2013.doc <br />