Laserfiche WebLink
1-6 <br /> — Motor Grader <br /> Water Truck <br /> Personnel <br /> — Construction Manager <br /> Field Inspector(s) <br /> Site Engineer(s) <br /> — Geotechnical Engineer/Geologist <br /> Geotechnical Technician(s) <br /> Labor Crews <br /> Equipment Operators <br /> Surveyors <br /> Mechanics <br /> Construction Schedule <br /> The start of partial closure construction activities for the FL partial closure and maintenance <br /> areas will commence once refuse fill elevations in that area are achieved. Table 2 presents <br /> the anticipated closure construction period for the maximum extent of the refuse footprint, an <br /> approximate 187 acre closure area. Closure construction activities will include the following <br /> tasks: <br /> ♦ Equipment Mobilization <br /> ♦ Signage <br /> ♦ Site Exploration and Survey <br /> ♦ Structure Removal/Demolition (last phase only) <br /> ♦ Excavation of Final Cover Soil (foundation and barrier vegetative layers only) <br /> ♦ Final Cover Placement (ineluding geememhrane <br /> ♦ Landfill Gas System Modifications <br /> ♦ Permanent Drainage Control Feature Installation <br /> ♦ Drainage Control Systems Modifications <br /> ♦ Seed and Mulch Installation <br /> ♦ Demobilization <br /> Some of these activities will be conducted concurrently. <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\appendices\app a-pcpcmp 2013\text\pcpcmp amend <br /> 2013.doc <br />