My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_6
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Disposal Of Purge Water <br />0111Y VOY low levels of either metallic or organic contarninaitts have been detected in some of <br />the wells downgradient of WMU A. Because these levels are vcry"low, there, is not sufficient <br />zwwn to containerize the purge water. Should the analytical results indicate a need to <br />containerize, the following proced= will, be used: <br />Sample purge water generat6d during well.purging, and excess water generated during <br />sampling, will be placed in a tafler mounted tank attached to- the sampling vehicle. <br />When the tank is full. the grottridwater will be pumped from the tank to an onsite leachate <br />evaporation pond. After the groundwater sampling round is completed the tank will be <br />fiUltd with 2PPro.-dulatelY 100 gallons of water from the water truck fill station._TILi.S <br />'Water Will then be recirculated in the tank and pump to Anse the system- The ruse water <br />will then be discharged to the leachate.evaporation pond__ <br />T114. domestic well sampled (D W-9690) contaim.a _submc=-blIC pump vfitb- an in-line <br />Pr`CSsUrC <br />tank and switch -to activate the pump once- the pressurc-drops below- a certain value--. 1ht--sample <br />point for -DW-9,690 was -a spigot directly attached to the presswe tauk- Water <br />samples v,,Vxe not <br />collected directly from the - voell becatise the aboveground plumbing and submersible PUIMPS <br />would need. to be removed- Prior to collecting the wat= samples, the pump was. <br />allowed to run <br />for approximately 3 0 minuties to, purge the water system and draw Mundwater from -the aquifer. <br />During sampling, the pumps cycled on-off because the pumping rate exceeded the spigot <br />discharge, <br />lffl�rl MOVI <br />.11.■: 1 raf <br />I1 1ru,11IRM <br />23493944-FOI1231OR3Z A -I I July 14, 2000 <br />2Q00 lCkintct�r. tae. <br />64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.