My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 EXECUTION <br /> 3.1 PROTECTION OF EXPOSED SURFACES <br /> A. During seasonal shutdowns and during other periods of prolonged exposure(more <br /> than 3 days) of excavated or filled areas, or stockpiles, the EARTHWORK <br /> CONTRACTOR shall provide labor, materials and equipment, as required by the <br /> OWNER, to maintain and protect exposed surfaces of cut-and-fill slopes against <br /> wind and water erosion and/or damage. Prior to the application of protective <br /> erosion control measures, the exposed surfaces shall be sloped to drain, and be <br /> compacted with a smooth drum roller, to eliminate ruts and ridges formed by <br /> construction equipment. Methods used to protect exposed surfaces must be <br /> approved by the QA/QC CONSULTANT; however, the EARTHWORK <br /> CONTRACTOR shall be responsible for the effectiveness of the protective <br /> method. In addition, the EARTHWORK CONTRACTOR shall be responsible <br /> for providing all necessary earthwork to protect all exposed geosynthetic materials <br /> installed by the GEOSYNTHETCS CONTRACTOR. <br /> 3.2 EARTHWORK -GENERAL <br /> A. Required lines, levels, contours and datum shall be identified by the <br /> EARTHWORK CONTRACTOR before the start of earthwork operations. <br /> B. Earthwork shall conform to lines, grades, and minimum thicknesses and slopes <br /> indicated on the Construction Drawings and as specified in this section. <br /> C. Drainage ditches shall be constructed and maintained to provide drainage during <br /> construction as directed by the OWNER. <br /> D. The EARTHWORK CONTRACTOR will be responsible for providing siltation <br /> control and management during construction, in general accordance with the site's <br /> approved Storm Water Pollution Prevention Plan. <br /> E. Care shall be taken during earthwork operations to avoid damaging synthetic <br /> components of the landfill including HDPE Pipe, Geotextile, and Geomembrane. <br /> Damage caused by the EARTHWORK CONTRACTOR shall be repaired at the <br /> EARTHWORK CONTRACTOR's expense in accordance with the applicable <br /> Specification requirements. <br /> Forward Landfill WMU FU-14 <br /> 02300 9 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.