material shall then be obtained from the northern onsite borrow source. <br /> D. The EARTHWORK CONTRACTOR shall make all reasonable efforts to <br /> determine the type of soil being excavated at all times. Equipment operators or <br /> the EARTHWORK CONTRACTOR's representative directing excavation shall <br /> have sufficient knowledge and understanding of soil classifications to determine <br /> general soil type. <br /> E. The EARTHWORK CONTRACTOR shall stockpile excavated material in <br /> accordance with Section 3.6 of this Specification and shall direct equipment <br /> operators to the appropriate stockpile area depending on the soil classification of <br /> the majority of material that makes up the excavation equipment's payload. <br /> F. Refuse may be encountered in some excavation areas. The EARTHWORK <br /> CONTRACTOR shall notify the DESIGN ENGINEER and QA/QC <br /> CONSULTANT if refuse is encountered in areas other than at tie-ins/connections <br /> to existing WMUs at the site. The DESIGN ENGINEER will provide guidance <br /> on the depth the refuse shall be excavated and the appropriate backfill procedures. <br /> The EARTHWORK CONTRACTOR shall dispose of the excavated refuse in the <br /> active portion of the landfill or as directed by the OWNER. <br /> G. Excavation to be carried out for the convenience of the EARTHWORK <br /> CONTRACTOR shall conform to the limits approved by the DESIGN <br /> ENGINEER, QA/QC CONSULTANT, and OWNER and shall be at no additional <br /> expense to the OWNER. <br /> H. Excavated material shall be placed a sufficient distance from the edge of <br /> excavations to prevent cave-ins or bank slides. <br /> I. The CONTRACTOR shall excavate to sufficient lines and grades to construct the <br /> compacted clay liner and sumps as shown on the Construction Drawings and <br /> described in these Specifications. <br /> J. Shape, trim, and cut ditches and other drainage structures as necessary to achieve <br /> grades and dimensions shown on the Construction Drawings. <br /> 3.5 LIMITS OF EXCAVATION <br /> A. Excavate to the depths and widths, as shown on the Construction Drawings. <br /> Allow for minimum thickness of clay liner as required. Excavation carried below <br /> the grade lines shown or established by the DESIGN ENGINEER shall be <br /> replaced with the same fill material as specified for the overlying fill or backfill, <br /> and compacted as required for such overlying fill or backfill. Where the overlying <br /> area is not to receive fill or backfill, replace the overexcavated material and <br /> compact to a density not less than that of the underlying ground. Cuts below <br /> grade shall be corrected by similarly cutting adjoining areas and creating a smooth <br /> transition. Correct all overexcavated areas at the EARTHWORK <br /> CONTRACTOR's sole expense. <br /> Forward Landfill WMU FU-14 <br /> 02300 11 EARTHWORK <br />