My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6 STOCKPILE ACTIVITIES <br /> ® A. Stockpile all excavated material. Uniformly grade stockpile area to conform to <br /> existing contours, leave with a neat appearance, and maintain current drainage <br /> patterns. The stockpile shall have a slope no greater than two horizontal to one <br /> vertical and the top surface shall have a minimum 5 percent grade. <br /> B. Selective Stockpiling: <br /> 1. The CONTRACTOR shall make all reasonable efforts to separately <br /> stockpile fine grained materials suitable for use as the Clay Liner and Clay <br /> Earthfill. Material suitable for use as protective operations layer shall be <br /> placed in separate stockpile. <br /> 2. The QA/QC CONSULTANT may sample and analyze all stockpiles created <br /> by the EARTHWORK CONTRACTOR. <br /> 3. If, in the opinion of the QA/QC CONSULTANT, the EARTHWORK <br /> CONTRACTOR is not adequately separating excavated soil in accordance <br /> with these Specifications, the QA/QC CONSULTANT may direct the <br /> EARTHWORK CONTRACTOR to modify his stockpiling operation or may <br /> order the EARTHWORK CONTRACTOR to halt excavation and <br /> stockpiling activities until adequate procedures can be developed. <br /> 4. Delays caused by inadequate stockpiling operation, as determined by the <br /> QA/QC CONSULTANT, shall not be cause for an extension in the <br /> EARTHWORK CONTRACTOR's completion dates or cause for <br /> ® EARTHWORK CONTRACTOR change orders and all additional cost <br /> associated shall be at the EARTHWORK CONTRACTOR's sole expense. <br /> 3.7 GRADING AND SUBGRADE PREPARATION <br /> A. This Work shall consist of fine grading and preparation of lining subgrade for the <br /> construction of the base lining. The lining subgrade is further defined as those <br /> areas and surfaces within the subgrade upon which lining materials are to be <br /> placed. <br /> 1. Fine grading shall be performed to grade the subgrade to within the tolerances <br /> specified in Section 01410, SURVEYS. <br /> 2. The prepared subgrade surface shall be smooth and free of major irregularities. <br /> The subgrade should contain no exposed particles larger than 3 inches or other <br /> surface irregularities which, in the opinion of the QA/QC CONSULTANT, <br /> will damage the 60-mil HDPE geomembrane. <br /> 3. Overexcavation below the established lining subgrade by the EARTHWORK <br /> CONTRACTOR shall, at his expense, be backfilled with Clay Liner Material <br /> or General Earthfill Material as directed by the QA/QC CONSULTANT. <br /> 4. Once completed, all traffic shall be kept off the lining subgrade. <br /> 5. The lining subgrade shall be maintained in the finished condition until the first <br /> succeeding course is placed. Any damage to the prepared lining subgrade by <br /> the EARTHWORK CONTRACTOR shall be repaired, at the EARTHWORK <br /> CONTRACTOR's expense. Any damage to the prepared lining subgrade by <br /> the GEOSYNTHETICS CONTRACTOR, including those caused by a delay <br /> Forward Landfill WMU FU-14 <br /> 02300 12 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.