My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the GEOSYNHETICS CONTRACTOR, shall be at the <br /> GEOSYNTHETICS CONTRACTOR's expense. <br /> 6. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br /> working days in advance of when the subgrade is completed and ready for as- <br /> built surveys. The OWNER will survey the top of the base and slope subgrade <br /> in accordance with Section 01410, SURVEYS. The survey shall provide <br /> coordinates and elevations of the subgrade surface at a minimum of 75-foot <br /> centers and delineating prominent features. The results of the survey will be <br /> provided to the QA/QC CONSULTANT within 2 days of the survey for <br /> approval prior to placing overlying materials. The QA/QC CONSULTANT <br /> shall have 2 working days to review survey results and may independently <br /> verify survey results. The time taken by the QA/QC CONSULTANT in <br /> checking and verifying the survey results will be considered included in the <br /> total calendar days allotted the EARTHWORK CONTRACTOR before <br /> liquidated damages are assessed. <br /> B. After completion of clay liner, proof-roll the surface of the entire lined area with a <br /> loaded dump truck or similar heavy-wheeled equipment to detect soft or loose <br /> zones. Notify the QA/QC CONSULTANT prior to commencement of <br /> proof-rolling. If soft or loose zones are found, excavate the soft or loose material <br /> to a depth accepted by the QA/QC CONSULTANT, then fill with Clay Liner. <br /> The Clay Liner shall be compacted as specified for such fill. <br /> 3.8 CONSTRUCTION OF CLAY LINER <br /> A. General: <br /> 1. Clay Liner Material shall be processed to meet the requirements of Article <br /> 2.3 of this Specification. The EARTHWORK CONTRACTOR may request <br /> information from the OWNER on successful processing and placement <br /> procedures used for the construction of previous WMUs at the Forward <br /> Landfill. The EARTHWORK CONTRACTOR shall have the option to <br /> determine construction procedures to be used, subject to the approval and <br /> acceptance testing by the QA/QC CONSULTANT. <br /> 2. The EARTHWORK CONTRACTOR shall process the Clay Liner Material <br /> suitable for the purpose intended. After processing, the Clay Liner Material <br /> shall be free from dry clods, roots, organic matter, frozen material, debris, <br /> rocks or stones larger than I inch, and other deleterious material. Clay <br /> Liner Material shall be thoroughly blended and compacted to provide a <br /> homogeneous material relatively uniform in gradation and moisture content. <br /> 3. The Clay Liner Material shall be as uniform as possible, free of penetrating <br /> cracks, and having interlift boundaries completely blended. The soil shall <br /> be kneaded by multiple passes with a heavy-weight footed compactor in <br /> order to produce a soil structure having low hydraulic conductivity, and not <br /> simply achieving a relative compaction goal. The top surface shall be <br /> smooth, graded to the grades shown on the Construction Drawings, and <br /> ready to receive overlying components of the lining system. The prepared <br /> surface shall be free of major irregularities, which in the opinion of the <br /> Forward Landfill WMU FU-14 <br /> 02300 13 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.