My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QA/QC CONSULTANT,may damage the overlying geomembrane. <br /> 4. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br /> working days in advance of when the clay is completed and ready for as- <br /> built surveys. The OWNER will survey the top of the clay liner to <br /> determine that the required minimum thickness and grades have been <br /> achieved. The survey shall be performed within two days of the clay liner <br /> being completed and in accordance with Section 01410, SURVEYS. The <br /> survey results will provide coordinates and elevations of the clay liner <br /> surface at the established 75-foot grid and delineating prominent features. <br /> The results of the survey shall be provided to the QA/QC CONSULTANT <br /> for approval prior to placing overlying materials. The QA/QC <br /> CONSULTANT shall have 2 working days to review survey results and <br /> may independently verify survey results. The time taken by the QA/QC <br /> CONSULTANT in checking and verifying the survey results will be <br /> considered included in the total calendar days allotted the EARTHWORK <br /> CONTRACTOR before liquidated damages are assessed. <br /> B. After completion of excavation in the base, and prior to clay liner construction, <br /> proof-roll the excavation surface with a loaded dump truck or similar heavy- <br /> wheeled vehicle to detect soft or loose zones. Notify the QA/QC CONSULTANT <br /> prior to commencement of proof-rolling. If soft or loose zones are found, <br /> excavate the soft or loose material to a depth accepted by the QA/QC <br /> CONSULTANT,then fill and compact with Clay Liner Material. <br /> C. Clay Liner Compaction: <br /> 1. Start after the successful completion of the clay liner subgrade. <br /> 2. Soil shall be spread evenly over the prepared subgrade with a thickness as <br /> required to achieve a 6-inch compacted lift, with a maximum 8-inch loose <br /> lift. <br /> 3. The minimum final thickness of the clay liner shall be as shown on the <br /> Construction Drawings. <br /> 4. Moisture conditioning shall be uniform throughout each lift. Use tilling, <br /> discing, or other options to thoroughly mix soil and water. If underlying <br /> lifts are allowed to dry out, they shall be reconditioned and recompacted <br /> prior to placement of new liner material. <br /> 5. The clay liner shall be compacted in-place to a minimum dry density of <br /> 93 percent relative compaction at a water content of 3 to 5 percent greater <br /> than the optimum water content as measured by ASTM D1557. <br /> 6. Scarify surface of each lift to a depth of 2 inches prior to placing the <br /> subsequent lift of Clay Liner Material. <br /> 7. Clay Liner Material shall not be placed at a water content that is high <br /> enough that excessive cracking occurs when the layer dries out. <br /> 8. Clay liner soil shall be sufficiently blended and compacted to provide a <br /> homogeneous clay liner sufficient to meet required permeability. <br /> Forward Landfill WMU FU-14 <br /> 02300 14 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.