D. Protection: <br /> 1. Do not route construction traffic on top of Coarse Gravel layer once <br /> material has been placed. <br /> 2. Constructed Coarse Gravel layer shall be maintained to meet the <br /> requirements of this Specification until final completion and acceptance of <br /> the Work. This shall include all measures to prevent erosion. During <br /> seasonal or other extended shutdowns, all exposed surfaces shall be <br /> protected as detailed in Article 3.1, PROTECTION OF EXPOSED <br /> SURFACES, of this Section. In addition, the Coarse Gravel shall be <br /> protected from any contamination that reduces the hydraulic conductivity. <br /> Any contaminated material shall be removed and replaced at no cost to the <br /> OWNER. <br /> 3.11 CONSTRUCTION OF GRANULAR DRAINAGE MATERIAL <br /> A. General Requirements: <br /> 1. GDM shall be placed and compacted to the lines and grades shown on the <br /> Construction Drawings or as required by the DESIGN ENGINEER. <br /> 2. The CONTRACTOR shall notify the OWNER at least 3 working days in <br /> advance of when the granular drainage material is completed and ready for <br /> as-built surveys. The OWNER will survey the top of the GDM within two <br /> days of the layer being completed to determine that the required minimum <br /> thickness has been achieved. The survey shall be performed in accordance <br /> with Section 01410, SURVEYS, and shall provide coordinates and <br /> elevations of the surface at the established 75-foot grid and delineating <br /> prominent features such as the edge of GDM. The EARTHWORK <br /> CONTRACTOR may use an alternative method for measuring the thickness <br /> of the GDM, with prior written approval of the OWNER and QA/QC <br /> CONSULTANT. The QA/QC CONSULTANT shall have 2 working days <br /> to review survey results and may independently verify survey results. The <br /> time taken by the CQA Team in checking and verifying the survey results <br /> will be considered included in the total calendar days allotted the <br /> EARTHWORK CONTRACTOR before liquidated damages are assessed. <br /> The results of the survey shall be provided to the QA/QC CONSULTANT <br /> for approval prior to placing the overlying materials. <br /> 3. A leak location test will be performed on the geomembrane before and after <br /> placement of the granular drainage material and protective operations layer. <br /> The GEOSYNTHETICS CONTRACTOR shall be responsible for repairing <br /> all identified leaks in the geomembrane prior to placement of the overlying <br /> earthwork and geosynthetic materials. The EARTHWORK <br /> CONTRACTOR shall be responsible for repairing all identified leaks in the <br /> geomembrane following placement of the overlying earthwork and <br /> geosynthetic materials. The EARTHWORK CONTRACTOR shall remove <br /> all earthwork and geosynthetic materials overlying the geomembrane to the <br /> extent required to repair the leak and shall repair all identified leaks in the <br /> geomembrane at his sole expense. Following the repair of the leak in the <br /> geomembrane, the EARTHWORK CONTRACTOR shall replace all <br /> Forward Landfill WMU FU-14 <br /> 02300 20 EARTHWORK <br />