8. Placement of granular drainage materials on the geomembrane shall not <br /> proceed when the ambient temperature is less than 40 degrees F or more <br /> than 104 degrees F, unless approved by the QA/QC CONSULTANT. <br /> 9. Placement of granular drainage materials on the geomembrane shall be <br /> halted when wrinkling of the geomembrane becomes excessive enough, in <br /> the opinion of the QA/QC CONSULTANT, to damage the geomembrane. <br /> The EARTHWORK CONTRACTOR will not be compensated for any costs <br /> or delays resulting from this halt in Work and shall schedule granular <br /> drainage material placement at times when wrinkling of the geomembrane, <br /> in the opinion of the QA/QC CONSULTANT, is minimal. Approval by the <br /> QA/QC CONSULTANT of appropriate times for GDM placement does not <br /> absolve EARTHWORK CONTRACTOR of responsibility for repairing any <br /> geomembrane lining material damages during GDM placement, at <br /> EARTHWORK CONTRACTOR's sole expense. <br /> C. Compaction Requirements: Compact using a minimum of two passes of a low <br /> ground pressure dozer (see Section 3.12.13.5), unless otherwise approved by the <br /> QA/QC CONSULTANT or DESIGN ENGINEER prior to start of the Work. <br /> Approval does not absolve the EARTHWORK CONTRACTOR of <br /> responsibilities for damage to the underlying geomembrane lining, at the <br /> EARTHWORK CONTRACTOR's sole expense. <br /> D. Quality Control: <br /> 1. General: As the GDM is being placed, the QA/QC CONSULTANT will be <br /> monitoring the construction activities and soil properties. If tests conducted <br /> by the QA/QC CONSULTANT indicate that the GDM does not meet <br /> specified requirements, the EARTHWORK CONTRACTOR shall <br /> terminate material placement until corrective measures are taken. <br /> 2. GDM Acceptance: Final acceptance of the GDM will be based on all tests <br /> made on completed Work on material samples taken from the completed <br /> layer, on leak location testing and repair, and on thickness as determined by <br /> the top of Clay Liner and top of GDM surveys. Testing for final acceptance <br /> shall be performed by the QA/QC CONSULTANT in accordance with <br /> these Specifications and the CQA Manual. <br /> E. Protection: <br /> 1. Do not route construction traffic on top of GDM once material has been <br /> placed. <br /> 2. Constructed GDM shall be maintained to meet the requirements of this <br /> Specification until final completion and acceptance of the Work. This shall <br /> include all measures to prevent erosion. During seasonal or other extended <br /> shutdowns, all exposed surfaces shall be protected as detailed in Article 3.1 <br /> of this Section. In addition, the GDM shall be protected from any <br /> contamination that reduces the hydraulic conductivity. Any contaminated <br /> materials shall be removed and replaced at no cost to the OWNER. <br /> Forward Landfill WMU FU-14 <br /> 02300 22 EARTHWORK <br />