My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:50 PM
Creation date
7/3/2020 10:58:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_7
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_7.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4-4 <br />0 4.1.2 Current Resource Recovery Activities <br />Salvaging, volume reduction, and recycling activities are conducted at the Forward RRF, <br />located in the southeast corner of the landfill. As previously mentioned, the RRF operates <br />under a separate SWFP as a transfer facility and composting facility. The transfer station <br />building is currently utilized for transfer (i.e., unloading of packer trucks and loading onto <br />transfer trailers) of recyclable materials. <br />4.1.3 Landfill Ancillary Facilities <br />The landfill ancillary facilities consist of an entrance facilities area, scales and scale houses, <br />water production wells, support and storage areas (i.e., office trailer and maintenance <br />building), a transfer station/materials recovery facility and composting facility, a landfill gas <br />flare station, a groundwater extraction and treatment plant, and sedimentation basins. <br />Figure 1A presents site facilities and features, as well as entry roads, property boundaries, <br />and refuse limits, as discussed in this JTD. <br />The entrance facilities area includes office trailers, portable sanitary facilities, a landscaped <br />area, and gravel and paved parking areas for employees and visitors. The main site office is <br />located in the entrance facility. <br />The main scalehouse for the Forward Landfill has two scales and is located in the central <br />portion of the site. Incoming waste loads are monitored at the scale house and all vehicular <br />activities are regulated in accordance with the established Hazardous Waste Exclusion <br />Program/Load Checking Program. A second scalehouse and scale is located in the <br />southeast portion of the landfill to serve the RRF. <br />Two water supply wells and one water supply standpipe are located at the landfill. The water <br />supply standpipe is located adjacent to the existing scalehouse. The water production well <br />that supplies the standpipe is located near the main entrance facility along the eastern <br />boundary. The well has a production of approximately 1,500 gpm. The other water supply <br />well is located south of the South Branch of Littlejohn's Creek and has a capacity of 500 <br />gpm. There are additional wells used primarily for irrigation located in the northwest corner <br />and the northeastern portion of the landfill. <br />The maintenance and storage area is currently located in the eastern portion of the landfill <br />main site office. The area is secured, and fenced but also mobile and can be moved around <br />the site, as needed. The maintenance area includes portable buildings, storage areas for <br />refuse bins, and parking areas for heavy equipment and cars. A complete vehicle repair <br />service facility, with an extensive inventory of spare parts, is also maintained. The <br />maintenance and storage area is operated in accordance with the site's SWPPP. <br />The RRF building is located at the southeast portion of the landfill with its own scale and <br />scalehouse and entrance/exit. The building is a metal frame building that is open on one <br />side. The total square footage of the building is approximately 12,000 square feet (sf). <br />Forward Landfill SWT Engineering <br />Joint Technical Document - April 2014; Amended June 2014 <br />z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\text\sec 4_final.dou <br />
The URL can be used to link to this page
Your browser does not support the video tag.