My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 11551 <br />FLARE STATION LANDFILL GAS BLOWER <br />PART 1 GENERAL <br />1.01 SUMMARY <br />A. The Contractor shall provide all labor, equipment, and material for the <br />completion of the work of this section. <br />B. The work of this Section includes but is not limited to providing and <br />installing a gas blower skid assembly. <br />1.02 SUBMITTALS <br />A. The Contractor shall submit to the Engineer manufacturer specifications and <br />data including blower model number, blower efficiency, horsepower, motor <br />efficiency, guard assembly details, and inlet and outlet connection details. <br />B. The manufacturer of the . gas blower shall submit in writing that the <br />blower's performance is in accordance with the specifications. A copy of <br />written verification shall be submitted to the Engineer by the Contractor. <br />PART 2 MATERIALS <br />2.01 MATERIAL SPECIFICATIONS <br />A. General - The blower shall be songle stage centrifugal type with metal <br />housing. The blower shall be manufactured by New York Blower, Aerovent <br />or approved equal. - <br />B. Material Selection - Materials and protective coatings in contact with <br />LFG shall be compatible with wet carbon dioxide gas, Iight organic acids <br />and hydrogen sulfide up to 150 PPM. Set screws, keys, etc., in the gas <br />cavity shall be stainless steel. No yellow metal shall be used for landfill <br />gas service. Blower body shall be steel. <br />C. Impellers - Impellers shall be made of aluminum. Impeller tip speed shall <br />not exceed 500 feet per second (ft/sec.) at maximum rotational frequency. <br />Vibration shall not exceed 1.5 mils in any direction. <br />Blower Drive - The blower shall be belt driven. The drive assembly shall <br />be rated for 150% of the required horsepower. The drive shall be <br />completely covered with a guard complying with pertinent OSHA standards. <br />North County LFG Collection System I FLARE STATION LANDFILL GAS BLOWER <br />San Joaquin County Public Works Section 11551 <br />
The URL can be used to link to this page
Your browser does not support the video tag.